hse group
hse group
hse group
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
PZR - Tender Project<br />
The preparation of Lot A1 for the execution<br />
of preparatory works was the foundation<br />
for the execution of the tender.<br />
36<br />
2.9.2 Overhead<br />
Lot TG for the purchase of turbines and<br />
generators and Lot A2 for main construction<br />
works have been published in<br />
the Official Gazette of the Republic of<br />
Slovenia on 13 December 2002.<br />
The Course of Purchasing Equipment<br />
and Services for Execution - Lot A1<br />
The tender procedure and the placing of<br />
the order for execution of preparatory<br />
works were completed on 22 November<br />
2002, when we signed a contract<br />
with the Gradis NG / GIZ Gradis consortium.<br />
Blanca HPP<br />
(Blanca Hydropower Plant)<br />
Three years after commencing the construction<br />
of the first hydropower plant<br />
on Lower Sava River is the planned<br />
start of construction of Blanca HPP.<br />
Blanca HPP is a combined run-of river<br />
storage hydropower plant featuring<br />
Kaplan turbines with a total spilling capacity<br />
of 500 m 3 /s, five spillways with a total<br />
capacity of approximately 3,500 m 3 /s and<br />
an average annual output of 160 GWh.<br />
Blanca HPP Basic Information<br />
Rated flow 500 m 3 /s<br />
Head<br />
10.70 m<br />
Rated output<br />
42.5 MW<br />
Average annual production 160 GWh<br />
Useful reservoir volume 1,390,000 m 3<br />
Average annual flow 243 m 3 /s<br />
Estimated value<br />
of investment in<br />
power generation SIT 13.5 billion<br />
Estimated value of<br />
infrastructure investments<br />
(Republic of Slovenia<br />
as the investor) SIT 4.5 billion<br />
The power station will be basically unmanned.<br />
It will be managed by the<br />
chain’s control center.<br />
Natural and<br />
Cultural Heritage Protection<br />
In planning the Blanca HPP structures<br />
and dam we will keep the intrusions<br />
into locations, areas and objects of natural<br />
value and cultural heritage to a<br />
minimum, as stated in the overall plan<br />
of construction of the Lower Sava River<br />
hydropower plants. The appropriate departments<br />
for the protection of natural<br />
treasures and cultural heritage will be<br />
included in the planning of structures,<br />
which ensure a good state of waters<br />
and water-dependent ecosystems to<br />
the largest possible extent, while at the<br />
same time enabling the satisfaction of<br />
economic, social and other human<br />
needs for water by implementing a sustainable<br />
use of nature’s wealth. The<br />
characteristic and most valuable parts<br />
of natural and cultural value will be documented<br />
in their current condition before<br />
any operations take place; any intrusions<br />
in these parts will only be allowed<br />
upon obtaining the approval of<br />
the competent department for the protection<br />
of natural and cultural heritage.<br />
Project Status<br />
In 2002 we have been preparing project<br />
tasks for the execution of the idea<br />
project and cooperating in concessionaire’s<br />
preparatory studies.<br />
Lower Sava River Hydropower<br />
Stations Project Investment Value for<br />
2002<br />
A total of SIT 220,545,000 was invested<br />
as part of the Lower Sava River<br />
Hydropower Stations Project in 2002.<br />
Telecommunications<br />
Network<br />
The analyses of needs for connectedness<br />
and for exchange of information<br />
as an indispensable tool for successful<br />
performance in a deregulated market<br />
show that by establishing our own telecommunication<br />
network we are also<br />
presented with new options of marketing<br />
certain telecommunication services<br />
and that by utilizing the previously installed<br />
telecommunication systems in<br />
companies within HSE Group relatively<br />
low infrastructure and equipment investments<br />
are required.<br />
Purpose of the Project<br />
The project’s purpose is to provide telecommunication<br />
services of high quality,<br />
speed, reliability and sufficient capacity,<br />
which can be upgraded and<br />
thereby satisfy the needs of:<br />
• The management system of the HSE<br />
balance <strong>group</strong> and production<br />
• Business informatics<br />
• The measurements and counter status<br />
calculation system<br />
• System of communication links between<br />
HSE business units and HSE<br />
Group companies