10.01.2015 Views

hse group

hse group

hse group

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

PZR - Tender Project<br />

The preparation of Lot A1 for the execution<br />

of preparatory works was the foundation<br />

for the execution of the tender.<br />

36<br />

2.9.2 Overhead<br />

Lot TG for the purchase of turbines and<br />

generators and Lot A2 for main construction<br />

works have been published in<br />

the Official Gazette of the Republic of<br />

Slovenia on 13 December 2002.<br />

The Course of Purchasing Equipment<br />

and Services for Execution - Lot A1<br />

The tender procedure and the placing of<br />

the order for execution of preparatory<br />

works were completed on 22 November<br />

2002, when we signed a contract<br />

with the Gradis NG / GIZ Gradis consortium.<br />

Blanca HPP<br />

(Blanca Hydropower Plant)<br />

Three years after commencing the construction<br />

of the first hydropower plant<br />

on Lower Sava River is the planned<br />

start of construction of Blanca HPP.<br />

Blanca HPP is a combined run-of river<br />

storage hydropower plant featuring<br />

Kaplan turbines with a total spilling capacity<br />

of 500 m 3 /s, five spillways with a total<br />

capacity of approximately 3,500 m 3 /s and<br />

an average annual output of 160 GWh.<br />

Blanca HPP Basic Information<br />

Rated flow 500 m 3 /s<br />

Head<br />

10.70 m<br />

Rated output<br />

42.5 MW<br />

Average annual production 160 GWh<br />

Useful reservoir volume 1,390,000 m 3<br />

Average annual flow 243 m 3 /s<br />

Estimated value<br />

of investment in<br />

power generation SIT 13.5 billion<br />

Estimated value of<br />

infrastructure investments<br />

(Republic of Slovenia<br />

as the investor) SIT 4.5 billion<br />

The power station will be basically unmanned.<br />

It will be managed by the<br />

chain’s control center.<br />

Natural and<br />

Cultural Heritage Protection<br />

In planning the Blanca HPP structures<br />

and dam we will keep the intrusions<br />

into locations, areas and objects of natural<br />

value and cultural heritage to a<br />

minimum, as stated in the overall plan<br />

of construction of the Lower Sava River<br />

hydropower plants. The appropriate departments<br />

for the protection of natural<br />

treasures and cultural heritage will be<br />

included in the planning of structures,<br />

which ensure a good state of waters<br />

and water-dependent ecosystems to<br />

the largest possible extent, while at the<br />

same time enabling the satisfaction of<br />

economic, social and other human<br />

needs for water by implementing a sustainable<br />

use of nature’s wealth. The<br />

characteristic and most valuable parts<br />

of natural and cultural value will be documented<br />

in their current condition before<br />

any operations take place; any intrusions<br />

in these parts will only be allowed<br />

upon obtaining the approval of<br />

the competent department for the protection<br />

of natural and cultural heritage.<br />

Project Status<br />

In 2002 we have been preparing project<br />

tasks for the execution of the idea<br />

project and cooperating in concessionaire’s<br />

preparatory studies.<br />

Lower Sava River Hydropower<br />

Stations Project Investment Value for<br />

2002<br />

A total of SIT 220,545,000 was invested<br />

as part of the Lower Sava River<br />

Hydropower Stations Project in 2002.<br />

Telecommunications<br />

Network<br />

The analyses of needs for connectedness<br />

and for exchange of information<br />

as an indispensable tool for successful<br />

performance in a deregulated market<br />

show that by establishing our own telecommunication<br />

network we are also<br />

presented with new options of marketing<br />

certain telecommunication services<br />

and that by utilizing the previously installed<br />

telecommunication systems in<br />

companies within HSE Group relatively<br />

low infrastructure and equipment investments<br />

are required.<br />

Purpose of the Project<br />

The project’s purpose is to provide telecommunication<br />

services of high quality,<br />

speed, reliability and sufficient capacity,<br />

which can be upgraded and<br />

thereby satisfy the needs of:<br />

• The management system of the HSE<br />

balance <strong>group</strong> and production<br />

• Business informatics<br />

• The measurements and counter status<br />

calculation system<br />

• System of communication links between<br />

HSE business units and HSE<br />

Group companies

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!