5.3 ELECTRICITY GENERATION<br />

ELECTRICITY GENERATING UNITS IN THE HSE GROUP<br />

Dravograd Vuzenica Vuhred Oæbalt Fala MB otok ZlatoliËje Formin Total<br />

DEM Number of generators 3 3 3 3 1+2 3 2+1 2<br />

Threshold power MW 27 57 60 60 58 60 127 116 565<br />

Installed generator power MVA 36 78 66 66 74 78 149 148 695<br />

Gross drop m 8,9 13,7 17,4 17,4 14,6 14,2 33 29 148<br />

Installed flow m 3’ /s 405 550 480 465 505 550 510 500<br />

71<br />

Moste I. Moste II. MavËiËe Medvode Vrhovo Total<br />

SEL Number of generators 3 2 2 3<br />

Threshold power MW 13,5 8 38 21 37 118<br />

Installed generator power MVA 22,5 11 50 27 42,9 153<br />

Gross drop m 70,45 177,2 17,5 21,2 8,12 294<br />

Installed flow m 3 /s 3x9,5 6 2x130 2x71 3x166,7<br />

Doblar I. Doblar II. Plave I. Plave II. Solkan ZadlaπËica Male HE Total<br />

SENG Number of generators 3 1 2 1 3 2<br />

Threshold power MW 30 40 15 19 32,4 8 15,8 160<br />

Installed generator power MVA 48 50 22 23 39 10 19,4 211<br />

Gross drop m 47,2 48,5 27,5 27,5 23<br />

Installed flow m 3 /s 90 105 75 105 180 2,2<br />

TEB Parna 1 Parna 2 PB I. PB II. PB III. PB IV. PB V. Total<br />

Threshold power MW 10 11 21 21 21 114 114 312<br />

Installed generator power MVA 16 15 32 32 32 155 155 437<br />

TE© Blok 1 Blok 2 Blok 3 Blok 4 Blok 5 Total<br />

Threshold power MW 27 27 68 246 315 683<br />

Installed generator power MVA 37,5 37,5 94 324 406 899<br />

HSE Group is Slovenia’s largest producer<br />

and supplier of electricity, as we<br />

produce more than half of Slovenia’s<br />

overall production of electricity. The<br />

companies of the Group represent a<br />

combination of production resources<br />

(hydropower plants, coal-fired and gasfired<br />

thermal power plants) that<br />

enables flexible production of electricity<br />

and the coverage of all types of consumers<br />

and providing all forms of ancillary<br />

services.<br />

In addition to a substantial market<br />

share in the Slovenian power supply<br />

market HSE Group was also the most<br />

important ancillary service supplier for<br />

the Slovenian operator of the power<br />

transmission system in 2002. Besides<br />

competing in the Slovenian electricity<br />

market the Group is also active in the<br />

wider region. Italy represents our main<br />

export market, and we trade with most<br />

of Europe’s most important companies.