5.3 Demand/Capacity<br />
Analysis 3<br />
Aircraft movements at <strong>EIA</strong> experienced 24 per cent<br />
growth between 2005 and 2008. Annual itinerant<br />
and business aviation movements increased from<br />
104,612 to 124,068. In 2009, traffic declined by<br />
3.5 per cent as a result of the global economic<br />
downturn. However, traffic has started a slow<br />
recovery in 2010, and is expected to grow between<br />
seven to ten per cent per year over the next five<br />
years, followed by another two to 2.5 per cent<br />
per year of growth for the next 20 years. Aircraft<br />
movements are forecast to increase to between<br />
247,000 and 356,000 by 2035 as shown in Exhibit 5.6.<br />
Annual Passengers<br />
Exhibit 5.6 | Aircraft Movements and Runway Capacity<br />
350,000<br />
Low Baseline High<br />
Runway Capacity Band<br />
280,000<br />
210,000<br />
140,000<br />
In 2008, an analysis was conducted to determine<br />
the hourly runway throughput for the two-runway<br />
system. The two-runway scenario for simulation<br />
assumed:<br />
• y Segregated operations – arrivals on Runway 30<br />
and departures on Runway 02<br />
70,000<br />
0<br />
2009<br />
2010<br />
2011<br />
2012<br />
2013<br />
2014<br />
2015<br />
2016<br />
2017<br />
2018<br />
2019<br />
2020<br />
2021<br />
2022<br />
2023<br />
2024<br />
2025<br />
2026<br />
2027<br />
2028<br />
2029<br />
2030<br />
2031<br />
2032<br />
2033<br />
2034<br />
2035<br />
• y Best operating practices based on ICAO<br />
(<strong>International</strong> Civil Aviation Organization)<br />
wake vortex separations, for operations above<br />
the CAT I weather threshold<br />
• y Availability of optimum Rapid Exit Taxiway<br />
(RET) system for two runways to minimize<br />
runway occupancy time (less than 55 seconds)<br />
<strong>Edmonton</strong> <strong>International</strong> <strong>Airport</strong> Draft Master Plan<br />
Chapter 5<br />
57