11.01.2015 Views

Edmonton International Airport - EIA Corporate

Edmonton International Airport - EIA Corporate

Edmonton International Airport - EIA Corporate

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

5.3 Demand/Capacity<br />

Analysis 3<br />

Aircraft movements at <strong>EIA</strong> experienced 24 per cent<br />

growth between 2005 and 2008. Annual itinerant<br />

and business aviation movements increased from<br />

104,612 to 124,068. In 2009, traffic declined by<br />

3.5 per cent as a result of the global economic<br />

downturn. However, traffic has started a slow<br />

recovery in 2010, and is expected to grow between<br />

seven to ten per cent per year over the next five<br />

years, followed by another two to 2.5 per cent<br />

per year of growth for the next 20 years. Aircraft<br />

movements are forecast to increase to between<br />

247,000 and 356,000 by 2035 as shown in Exhibit 5.6.<br />

Annual Passengers<br />

Exhibit 5.6 | Aircraft Movements and Runway Capacity<br />

350,000<br />

Low Baseline High<br />

Runway Capacity Band<br />

280,000<br />

210,000<br />

140,000<br />

In 2008, an analysis was conducted to determine<br />

the hourly runway throughput for the two-runway<br />

system. The two-runway scenario for simulation<br />

assumed:<br />

• y Segregated operations – arrivals on Runway 30<br />

and departures on Runway 02<br />

70,000<br />

0<br />

2009<br />

2010<br />

2011<br />

2012<br />

2013<br />

2014<br />

2015<br />

2016<br />

2017<br />

2018<br />

2019<br />

2020<br />

2021<br />

2022<br />

2023<br />

2024<br />

2025<br />

2026<br />

2027<br />

2028<br />

2029<br />

2030<br />

2031<br />

2032<br />

2033<br />

2034<br />

2035<br />

• y Best operating practices based on ICAO<br />

(<strong>International</strong> Civil Aviation Organization)<br />

wake vortex separations, for operations above<br />

the CAT I weather threshold<br />

• y Availability of optimum Rapid Exit Taxiway<br />

(RET) system for two runways to minimize<br />

runway occupancy time (less than 55 seconds)<br />

<strong>Edmonton</strong> <strong>International</strong> <strong>Airport</strong> Draft Master Plan<br />

Chapter 5<br />

57

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!