SPONSORS OF EAST OF SCOTLAND<br />
Neart na Gaoithe<br />
Offshore <strong>Wind</strong> Farm<br />
Shepherd and Wedderburn is acting<br />
for its client Mainstream Renewable<br />
Power on the Neart na Gaoithe (Gaelic<br />
for ‘Strength of the <strong>Wind</strong>’) wind farm<br />
development, proposed for Scotland’s<br />
outer Firth of Forth, more than 15km<br />
off the coast of Fife.<br />
Subject to planning consent, Neart na<br />
Gaoithe will produce up to 450MW of<br />
renewable power – enough electricity to<br />
power 325,000 homes – from a 105 km2<br />
site with up to 125 turbines sited in water<br />
depths of 45 – 55 metres.<br />
Gordon Downie<br />
Capital investment<br />
The development is<br />
targeting a carbon<br />
payback period of two<br />
to three years and<br />
represents a capital<br />
investment of up to<br />
£1.4bn, making it one of<br />
the largest projects of its<br />
kind in Scotland. It will<br />
have installed capacity<br />
to produce up to 3.7 per<br />
cent of Scotland’s current<br />
electricity demand,<br />
making a significant contribution to the<br />
Scottish Government’s 2020 target<br />
to produce all of Scotland’s electricity<br />
demand from renewable sources.<br />
Advice and guidance<br />
Shepherd and Wedderburn is working<br />
closely with Mainstream on a number<br />
of core aspects of Neart na Gaoithe,<br />
including the overall consenting of the<br />
development. The firm is also advising on<br />
the contracts, grid connection and land<br />
arrangements needed for the project.<br />
Shepherd and Wedderburn will also<br />
guide Mainstream through the planning<br />
requirements for the onshore element<br />
of the development. An application will<br />
be submitted to East Lothian Council<br />
later this year for a fully underground, 12<br />
km power cable, which will run from its<br />
onshore location at Thorntonloch Beach<br />
through to Crystal Rig II wind farm, where<br />
it will connect to the National Grid.<br />
Shepherd and Wedderburn<br />
www.shepwedd.co.uk<br />
REpower<br />
Systems SE<br />
a case study<br />
REpower Systems SE is one of the<br />
leading international manufacturers of<br />
onshore and offshore wind turbines with<br />
their head office based in Edinburgh<br />
and service centres across the country.<br />
They are one of the UK’s fastest growing<br />
wind turbine manufacturers with over 150<br />
employees and more than 1GW worth of<br />
total signed contracts in the UK and has<br />
to date delivered 43 onshore wind farms<br />
in Scotland, England and Wales and two<br />
offshore wind farms...<br />
• Project Beatrice in the North Sea<br />
• 150 MW Ormonde wind farm in the<br />
Irish Sea<br />
Beatrice<br />
The Beatrice Project was unique in the<br />
world as the first offshore wind project<br />
installed in water depths of around 45m.<br />
A floating heavy lift crane barge was used<br />
to install the fully pre-assembled wind<br />
turbines. The two REpower wind turbines<br />
are an extension of the existing offshore<br />
oil installation in the Beatrice Field. They<br />
are connected to the 33kV grid from the<br />
shore and provide a significant share of the<br />
electricity needed on the Beatrice oil rigs for<br />
oil exploitation.<br />
The mission of this demonstrator project<br />
was to prove the feasibility and viability<br />
of deepwater offshore wind farms.<br />
The Beatrice Demonstrator is part of<br />
DOWNVInD (Distant Offshore <strong>Wind</strong> farms<br />
with No Visual Impact in Deepwater).<br />
Onshore<br />
Onshore, the company has expertise<br />
installing turbines in remote and complex<br />
areas as developers look further afield for<br />
sites. This ranges from logistics solutions,<br />
to additional grid capability.<br />
Burnfoot Hill<br />
The Burnfoot Hill project for EDF was one<br />
example of complex logistical planning.<br />
The site, some 11km from the main road,<br />
presented several challenges; not least<br />
the transport of all the components up<br />
long steep inclines (15%) to the top of<br />
a hill 600m above sea level. All thirteen<br />
turbines were installed only 28 days after<br />
first mobilising to site. This was especially<br />
successful given the extremely adverse<br />
weather conditions faced by the team.<br />
Despite this, the commissioning was<br />
finished ahead of schedule and the project<br />
was handed over to the client on time and<br />
on budget.<br />
Future development<br />
Future development will also be focused<br />
on high wind speed sites in order to offer<br />
the consumer best value from wind and, in<br />
line with this, REpower recently announced<br />
the expansion of their 3 megawatt turbine<br />
series which will see a re-certification of the<br />
3.4M104 machine for higher wind speeds.<br />
REpower<br />
www.repower-uk.co.uk<br />
www.windenergynetwork.co.uk<br />
87