SPONSORS OF SERVICING OFFSHORE WINDFARMS<br />

Reducing maintenance costs<br />

High Voltage Partial Discharge (HVPD)<br />

are experts in the field of on-line<br />

partial discharge (OLPD) condition<br />

monitoring.They supply onshore<br />

and offshore renewable customers<br />

in the UK and overseas with OLPD<br />

solutions for the condition monitoring<br />

of in-service high voltage (HV) cables,<br />

switchgear and transformers.<br />

Case study<br />

A recent PD test, monitoring and<br />

preventative cable repair project for<br />

a major offshore wind farm in the UK<br />

illustrated how the OLPD insulation<br />

condition monitoring can lead to<br />

significant maintenance and operation<br />

cost reductions.<br />

Testing and diagnostics<br />

Initial on-line PD testing to assess the<br />

insulation condition of two 33 kV export<br />

cables connecting the offshore wind<br />

farm to shore, indicated high PD activity<br />

levels in one of the cables. Additional<br />

diagnostic and cable mapping tests<br />

identified the source of PD activity at<br />

one of the land section cable joints.<br />

The wind farm operator decided to<br />

replace the unreliable joint during a<br />

planned maintenance outage and<br />

the cable was re-tested. The post<br />

repair PD measurement results<br />

were acceptable and the weak<br />

point (the ‘incipient fault’) in the<br />

cable’s HV insulation had been<br />

removed.<br />

Cost benefit analysis<br />

The total cost of this planned, preventative<br />

maintenance repair was around £10,000<br />

whilst the estimated cost of a previous<br />

unplanned outage was £127,000.<br />

According to UK Government’s<br />

Department of Environmental and Climate<br />

Change (DECC), such cost reductions are<br />

essential to drive down the operational<br />

costs of offshore windfarms.<br />

Cost reduction target<br />

DECC have put a target of reducing the<br />

total cost of offshore wind generation by<br />

25% from the present ‘typical’ lifecycle<br />

cost of £135/MWh (for a 500MW<br />

windfarm) to below £100/MWh by<br />

2020. HVPD believe that these cost<br />

reductions will only be achievable through<br />

the application of condition monitoring<br />

technology such as the HVPD OLPD<br />

monitoring.<br />

HVPD<br />

www.hvpd.co.uk<br />