Annex 6: Implementation Arrangements<br />
INDIA: <strong>Mumbai</strong> Urban Transport Project-2A<br />
126. MRVC is the project implementing agency for MUTP-2A and in that role is<br />
accountable for satisfactory completion of all the works of MUTP-2A. MMRDA, ICF, RDSO,<br />
WR and CR 30 are executing agencies. As the project implementing agency, MRVC is<br />
responsible for financing and procurement of all the contracts financed by the loan, including<br />
major equipment such as rolling stock/AC-DC equipment/cables, etc. as also for executing<br />
certain identified works in the field with due safeguards in consultation with the Zonal <strong>Railway</strong>s.<br />
MOUs which incorporate insurance to respect EMP, time line of works and activities to be<br />
carried out by respective agencies, etc. will be set up between MRVC and the executing<br />
agencies.<br />
127. The execution of new line works which interfere with the running railway and<br />
require extensive block working are to be specifically listed out and carried out by the concerned<br />
Zonal <strong>Railway</strong>s. The new lines work which interfere with the running railway only at the track<br />
linking on the two ends can be executed by MRVC with due safeguards.<br />
128. The works included in MUTP-2A have been selected to ensure that there is<br />
minimal Resettlement and Rehabilitation or land acquisition involved. This resettlement, which<br />
is expected to be very limited in extend, will be executed out by MMRDA, as per specific<br />
conditions stated in a Memorandum of Understanding (MOU) between MRVC and MMRDA 31 .<br />
129. Role of MRVC: Chart 1 below illustrates MRVC’s role as implementing agency of<br />
MUTP-2A.<br />
30 Central <strong>Railway</strong> and Western <strong>Railway</strong> are two of the largest and busiest of the 16 zones of Indian <strong>Railway</strong>s. Their<br />
respective divisions <strong>Mumbai</strong> CSTM and <strong>Mumbai</strong> are specifically involved in this project. Indian <strong>Railway</strong>s is a<br />
department owned and controlled by the Government of India, via the Ministry of <strong>Railway</strong>s. IR manufactures much<br />
of its rolling stock and heavy engineering components at its six manufacturing plants, called Production Units,<br />
which are managed directly by the ministry. Integral Coach Factory at Chennai (ICF) is one of these. Each of the<br />
six production units is headed by a General Manager, who reports directly to the <strong>Railway</strong> Board. Research Design<br />
and Standards Organization (RDSO) is a research and development organization under the Ministry of <strong>Railway</strong>s,<br />
which functions as a technical adviser and consultant to the <strong>Railway</strong> Board, the Zonal <strong>Railway</strong>s, the <strong>Railway</strong><br />
Production Units in respect of design and standardization of railway equipment and problems related to railway<br />
construction, operation and maintenance.<br />
31 MMRDA is a body of the Government of Maharashtra set up under the <strong>Mumbai</strong> Metropolitan Region<br />
Development Authority Act, 1974 Government of Maharashtra as an apex body for planning and co-ordination of<br />
development activities in the Region.<br />