Estimated disbursements (<strong>Bank</strong> FY/US$m)<br />

FY 2010 2011 2012 2013 2014 2015<br />

Annual 3 19 74 130 127 77<br />

Cumulative 3 22 96 226 353 430<br />

Project implementation period: Start January 31, 2010 End: June 15, 2015<br />

Expected effectiveness date: September 15, 2010<br />

Expected closing date: June 15, 2015<br />

Does the project depart from the CAS in content or other significant respects<br />

Ref. PAD I.C.<br />

Does the project require any exceptions from <strong>Bank</strong> policies<br />

Ref. PAD IV.G.<br />

Have these been approved by <strong>Bank</strong> management<br />

Is approval for any policy exception sought from the Board<br />

Does the project include any critical risks rated “substantial” or “high”<br />

Ref. PAD III.E.<br />

Does the project meet the Regional criteria for readiness for implementation<br />

Ref. PAD IV.G.<br />

[ ]Yes [X ] No<br />

[ ]Yes [X] No<br />

[ ]Yes [ ] No<br />

[ ]Yes [X] No<br />

[ ]Yes [X] No<br />

[ X ]Yes [ ] No<br />

Project development objective Ref. PAD II.C., Technical Annex 3<br />

To improve the passenger carrying capacity, operational efficiency, level of comfort of, and the<br />

institutional capacity of entities involved in, the suburban rail system of <strong>Mumbai</strong> Metropolitan<br />

area.<br />

Project description Ref. PAD II.D., Technical Annex 4<br />

Component 1: Rolling stock fleet increase with procurement of 864 EMU cars.<br />

Component 2: Conversion of electric traction system from 1500V DC to 25kV AC on the<br />

Central <strong>Railway</strong>, with signal and telecom system improvements.<br />

Component 3: Maintenance facilities and stabling lines to accommodate the additional trains.<br />

Component 4: Capacity Strengthening and Technical assistance.<br />

Which safeguard policies are triggered, if any Ref. PAD IV.F., Technical Annex 10<br />

Environmental Assessment (OP/BP 4.01)<br />

Involuntary Resettlement (OP/BP 4.12)<br />

Significant, non-standard conditions, if any, for:<br />

Ref. PAD III.F.<br />

Loan/credit effectiveness:<br />

The Additional Conditions of Effectiveness consist of the following: the SFA and the MOU with<br />

the ICF have been executed.<br />