24.01.2015 Views

Download as pdf - andritz business areas

Download as pdf - andritz business areas

Download as pdf - andritz business areas

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Customer Projects<br />

Environment and Process Business Area<br />

041<br />

Andritz h<strong>as</strong> delivered<br />

Europe’s largest sludge<br />

drying plant to the<br />

W<strong>as</strong>tewater Treatment<br />

Plant of PSYTTALIA/ATHENS,<br />

Greece.<br />

[1] The sludge drying plant consists of four identical drying lines with a total<br />

nominal capacity of 34.5 tons of water evaporation per hour. The drying<br />

process can be fueled by natural g<strong>as</strong> <strong>as</strong> well <strong>as</strong> biog<strong>as</strong>.<br />

Photo: Drying drum, furnace, and burner of one line<br />

[2] Dried sludge (granulate) loading station. The granulate can be used<br />

<strong>as</strong> a substitute for fossil fuels in heat and power generation systems or<br />

for soil improvement.<br />

[3] Andritz provided a complete supply and services package consisting<br />

of engineering, purch<strong>as</strong>ing, manufacturing, supervision of erection, and<br />

start-up of the drying plant. Photo: View of the individual levels<br />

[1]<br />

[2]<br />

ANDRITZ Global Top Products 2007<br />

[3]

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!