RASHTRIYA ISPAT NIGAM LIMITED<br />

No of PDD prepared 9<br />

No of PDDs Submitted to Designated<br />

National Authority <strong>for</strong> Host Country Approval 9<br />

No of projects <strong>for</strong> DNA meeting held 8<br />

No of Projects-Approved by DNA 6<br />

No of projects under validation 2<br />

RINL organized stakeholder meeting <strong>for</strong> following CDM projects on 7 th Dec' <strong>2011</strong> at Ukkunagaram in the<br />

presence of Union representatives, employees, NGOs and State Government officials to elicit comments.<br />

i) 2x60 MW Waste BF gas based captive power plant<br />

ii) Installation of Energy Efficient Air separation unit<br />

iii) Pulverized Coal Injection in Blast Furnaces 1,2<br />

iv) Waste Heat Recovery from Special Bar Mill #2<br />

v) Waste Heat Recovery from Wire Rod Mill #2<br />

vi) Billet Caster in <strong>Steel</strong> Melting Shop#2<br />

These comments will be incorporated in Project Design Documents of respective projects. PDD <strong>for</strong> these<br />

projects will be submitted to Designated National Authority <strong>for</strong> Host Country Approval shortly.<br />

3. RINL is planning to migrate from BS EN: 16000 Energy Management System to ISO: 50001. Necessary<br />

documentation has been completed<br />

4. RINL has been adjudged as Excellent Energy Efficient Unit by Confederation of Indian Industry Green Business<br />

center National Award <strong>for</strong> Excellence in Energy Management-<strong>2011</strong><br />

B) Other achievements<br />

LD gas recovery plant<br />

Total volume of LD gas recovered 311.85 MNcum<br />

2. Waste heat recovery at:<br />

a. Back pressure turbine station<br />

Total power generated 105390 MWH<br />

b. Gas Expansion Turbine Station<br />

Total power generated 85824 MWH<br />

***MNCum = Million Normal Cubic meters *<br />

**MWH = Mega Watt Hours<br />

C) Foreign Exchange Earnings & Outgo<br />

a) Foreign Exchange inflow ` 544.51 crores<br />

b) Foreign Exchange outflow ` 5569.86 crores<br />

(includes ` 193.40 crores on Expansion activities)<br />