Revised discharge-drainage area relationships for the Verde River are shown<br />

below.<br />

TABLE 5 – SUMMARY OF DISCHARGES<br />

FLOODING SOURCE<br />

AND LOCATION<br />

DRAINAGE<br />

AREA<br />

(sq. miles)<br />

PEAK DISCHARGES (cfs)<br />

10-PERCENT 2-PERCENT 1-PERCENT 0.2-PERCENT<br />

Verde River<br />

At USGS gage<br />

no. 09504000 3,124 22,750 55,100 75,100 136,700<br />

At US Route 89A bridge 3,247 23,900 58,200 79,600 149,700<br />

Below confluence with<br />

Oak Creek 3,776 28,700 72,100 100,000 193,900<br />

Below confluence with<br />

West Beaver Creek 4,287 33,500 86,300 121,200 241,000<br />

Below confluence with<br />

West Clear Creek 4,619 36,800 96,000 135,600 273,900<br />

At USGS gage<br />

no. 09506000 4,645 37,000 96,800 136,700 276,500<br />

For the approximate Zone A studies, 1%-annual-chance discharges were taken<br />

from section 3.1 of this FIS report. In cases where effective discharges were not<br />

available, discharges developed by Yavapai County using USGS regional<br />

regression equations were used (Reference 3).<br />

e. Hydraulic Analysis<br />

For the Verde River, water surface elevations and floodway limits were<br />

computed using georeferenced modeling data within the USACE HEC-GeoRAS<br />

computer software (Reference 4). Both upstream and downstream study limits<br />

are bound by the Prescott National Forest, while the downstream limit is also<br />

bound by the Coconino National Forest. No future developmental impacts are<br />

anticipated in these areas.<br />

The downstream boundary condition for the Verde River was set to utilize the<br />

normal depth method and a slope of 0.004734 ft/ft, based on a 2,000-foot<br />

sample reach. No known water surface elevation for this location was available<br />

from the previous study.<br />

The floodway was prepared using standard method 1 and method 4 in HEC-<br />

GeoRAS. These two methods reflect the same encroachments at each cross<br />

section, with the exception of a customized adjustment applied at the 10th Street<br />

Bridge that results from poor alignment between the approach roadway and the<br />

bridge structure.<br />

Irrigation canals and diversion structures were modeled assuming they are at<br />

capacity and cannot divert or convey flow. Additional modeling considerations<br />

were made for the Interstate 17 embankment and bridges (Reference 1).<br />