27.01.2015 Views

YAVAPAI COUNTY, ARIZONA Federal Emergency ... - FEMA Region 9

YAVAPAI COUNTY, ARIZONA Federal Emergency ... - FEMA Region 9

YAVAPAI COUNTY, ARIZONA Federal Emergency ... - FEMA Region 9

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

authority and acknowledgments for each jurisdiction included in this countywide<br />

FIS, as complied from their previous printed FIS reports, is shown below.<br />

Camp Verde, Town of:<br />

the hydrologic and hydraulic analyses of the<br />

Verde River and Beaver Creek were taken<br />

from the Yavapai County FIS (U.S.<br />

Department of Agriculture, 1964) and<br />

performed by Henningson, Durham, and<br />

Richardson, Inc., for <strong>FEMA</strong>, under Contract<br />

No. H-4644. This work was completed in<br />

January 1981.<br />

The study was revised September 27, 1991,<br />

to revise the flooding for West Clear Creek.<br />

The analyses required under the scope of<br />

work for West Clear Creek were performed<br />

by AGK Engineers, Inc., for <strong>FEMA</strong>, under<br />

Contract No. EMW-89-C-02839. This work<br />

was completed in May 1990.<br />

This study was revised September 20, 1996,<br />

to incorporate the effects of a revised<br />

hydraulic analysis along the Verde River<br />

and new hydrologic and hydraulic analyses<br />

for Lucky Canyon Wash, Copper Canyon<br />

Wash, and Cherry Creek. This work was<br />

performed by Wood, Patel & Associates,<br />

Inc., for <strong>FEMA</strong>, under Contract No. EMW<br />

93-C-4156, and was completed in July 1994.<br />

Flooding of Cherry Creek was studied by<br />

detailed methods from the confluence with<br />

the Verde River upstream for approximately<br />

1.5 miles. Lucky Canyon Wash was studied<br />

from the Verde River upstream<br />

approximately 0.5 mile; Copper Canyon<br />

Wash was studied from the Verde River<br />

upstream approximately one mile; and the<br />

Verde River was studied from Cross Section<br />

L upstream to the Town of Camp Verde<br />

corporate limits. Flooding sources studied<br />

by approximate methods included portions<br />

of Cherry Creek, Lucky Canyon Wash,<br />

Verde River, Beaver Creek, and West Clear<br />

Creek.<br />

The study was revised again on<br />

December 19, 1997, to add road names and<br />

correct errors in the description of ERM<br />

2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!