F.R.A.M.E.<br />

The central airport building was completely renewed and provided for a larger flow of<br />

passengers with more comfort and more services. The new fire safety concept addresses all<br />

weaknesses found during the analysis of the 1996 event, and uses the following main goals :<br />

minimising fire loads,<br />

compartimentation,<br />

early detection of fire,<br />

smoke control,<br />

safeguarding the evacuation<br />

The data available in the reference article were enough to recalculate the fire risk for the new<br />

concept. The results of this calculation show a very low residual risk, which goes beyond the<br />

standard "good" level proposed by <strong>FRAME</strong>. In the next table , the improved values are in bold.<br />

Item explanation (sub) factor Value Result<br />

Type of occupancy Dusseldorf Airport 2000+ concept<br />

<strong>Fire</strong> load immobile Qi 150<br />

<strong>Fire</strong> load mobile Qm 400 q=1.28<br />

Temperature rise T 250<br />

Average dimension m 0.3<br />

Reaction to fire M 1.0 i=0.90<br />

Length l 250<br />

Width b 90 g=3.61<br />

Level level access improved E 0 e=1.00<br />

Height of room h 5<br />

Ventilation smoke venting system k 1.16 % v=0.94<br />

Access direction Z 2<br />

Height difference H 0 z=1.00<br />

Potential <strong>Risk</strong>s P= 4.30 P1=1.19 P2=3.37<br />

Activation factor<br />

Main: non industrial a 0<br />

a=0.0<br />

Heating : ok<br />

Electrical: ok<br />

Explosion: no<br />

Secondary: none<br />

0<br />

0<br />

0<br />

0<br />

Occupants Number: 4000<br />

Mobility factor: 2<br />

Exits X 72<br />

Exit directions k 2<br />

Evacuation time factor<br />

t=0.37<br />

Content factor: 200 M. Euro c=0.37<br />

environment factor r r= 0.32<br />

dependency factor d d= 0.30<br />

Acceptable <strong>Risk</strong>s A= 0.86 A1= 0.91 A2 =0.93<br />

Water supplies adequate W=1.00<br />

Normal protection limited training N = 0.90<br />

Special Protection automatic detection,<br />

S= 14.64<br />

sprinklers, permanently<br />

staffed station, private<br />

airport brigade<br />

<strong>Fire</strong> resistance Structure: 90<br />

F=1.08<br />

Walls: 60<br />

Ceiling:60<br />

Partitions:0<br />

Escape protection see above U= 12.04<br />

Salvage<br />

safeguarded data and<br />

Y=1.63<br />

repair<br />

Calculated <strong>Risk</strong>s: R= 0.35 R1= 0.12 R2=0.17<br />

Conclusion:<br />

inadequate protection<br />