F.R.A.M.E.<br />

Case study 26. <strong>Fire</strong> safety for a drink manufacturing plant.<br />

The factory of this alcoholic drink manufacturer developed from a small distillery into a large<br />

mixing and bottling unit. During the development process modifications and extensions were<br />

numerous, so that the plant needed a thorough fire safety improvement program. The insurers<br />

practically imposed sprinklers for the whole plant, and the question was raised if this was<br />

enough to guaranteed also a level of fire safety that was acceptable for the authorities and<br />

that guaranteed also business continuity.<br />

A number of <strong>FRAME</strong> calculations were made to check the new situation.<br />

Item explanation (sub) factor Value Result<br />

Type of occupancy Alcohol storage in (metal) tanks 2003<br />

<strong>Fire</strong> load immobile combustible construction Qi 0<br />

<strong>Fire</strong> load mobile Qm 2400 q=1.70<br />

Temperature rise alcohol T 50<br />

Average dimension tanks m 1<br />

Reaction to fire most metallic M 1 i=1.05<br />

Length l 85<br />

Width b 80 g=2.44<br />

Level E 0 e=1.00<br />

Height of room h 7<br />

Ventilation k 1 % v=1.02<br />

Access direction Z 3<br />

Height difference H 0 z=1.05<br />

Potential <strong>Risk</strong>s P= 4.65 P1=1.91 P2=2.73<br />

Activation factor<br />

Main: storage<br />

Heating in room, gas<br />

Electrical: no regular<br />

control<br />

Explosion: zone 2<br />

Secondary: battery<br />

chargers<br />

a 0<br />

0.1<br />

0.1<br />

Occupants Number: 50<br />

Mobility factor: 1<br />

Exits X 6<br />

Exit directions k 4<br />

Evacuation time factor<br />

0.1<br />

0.1<br />

a=0.4<br />

t=0.04<br />

Content factor: 6 M. euro , c=0.0<br />

environment factor r r= 0.10<br />

dependency factor low d d= 0.15<br />

Acceptable <strong>Risk</strong>s A= 1.16 A1= 1.06 A2 =1.05<br />

Water supplies limited network W=0.86<br />

Normal protection<br />

Special Protection<br />

limited training, brigade<br />

at +10 min<br />

sprinkler protection,<br />

dedicated water supply,<br />

daytime staffed station<br />

<strong>Fire</strong> resistance Structure: 30<br />

Walls: 30<br />

Ceiling: 0<br />

Partitions:0<br />

steel<br />

structure,<br />

brick<br />

walls<br />

N = 0.81<br />

S= 5.00<br />

F=1.10<br />

Escape protection sprinklers, fire brigade,<br />

U=3.56<br />

max. 300 persons<br />

Salvage protected data, more Y=1.34<br />

42