<strong>CASTOR</strong> <strong>Pilot</strong> <strong>Plant</strong><br />
Cooling water circuit<br />
Wash section<br />
Treated<br />
flue gas<br />
<strong>CO</strong> 2 Out<br />
Make up water<br />
Condensate<br />
Reclaimer<br />
Reboiler<br />
Steam<br />
Flue gas from<br />
power plant<br />
ABSORBER<br />
MEA/MEA heat<br />
exchanger<br />
STRIPPER<br />
Rich MEA<br />
Mechanical filters<br />
Lean MEA<br />
Cleaned Flue Gas <strong>and</strong> <strong>CO</strong> 2 Product<br />
are returned to <strong>the</strong> power plant's flue gas duct<br />