CASTOR, CESAR and the Esbjerg CO Capture Pilot Plant - Zero
CASTOR, CESAR and the Esbjerg CO Capture Pilot Plant - Zero
CASTOR, CESAR and the Esbjerg CO Capture Pilot Plant - Zero
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>CASTOR</strong> <strong>Pilot</strong> <strong>Plant</strong> Objectives<br />
The test facility shall<br />
Prove long-term stable operation on coal flue gas<br />
Act as a test facility for dedicated tests (e.g. test of novel solvents)<br />
Provide information about<br />
Operation costs<br />
Maintenance costs<br />
Reliability<br />
Operation flexibility<br />
Environmental issues<br />
Engineering experience<br />
Doc. info<br />
5