01.02.2015 Views

CASTOR, CESAR and the Esbjerg CO Capture Pilot Plant - Zero

CASTOR, CESAR and the Esbjerg CO Capture Pilot Plant - Zero

CASTOR, CESAR and the Esbjerg CO Capture Pilot Plant - Zero

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>CASTOR</strong> Project: Objectives <strong>and</strong> Main Data<br />

<strong>CASTOR</strong> – <strong>CO</strong> 2 from capture to storage<br />

4-year European integrated project (Feb 2004 – Jan 2008)<br />

<strong>CASTOR</strong><br />

Budget: ~16 M€ (EU funding: 8.5 M€)<br />

Objectives<br />

Reduce <strong>the</strong> cost of <strong>CO</strong> 2 post-combustion capture<br />

Contribute to <strong>the</strong> feasibility & acceptance of <strong>the</strong> geological storage concept<br />

Validate <strong>the</strong> concept on real site(s)<br />

<strong>Pilot</strong> plant testing for capture<br />

Detailed studies of future storage projects<br />

Doc. info<br />

2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!