CASTOR, CESAR and the Esbjerg CO Capture Pilot Plant - Zero
CASTOR, CESAR and the Esbjerg CO Capture Pilot Plant - Zero
CASTOR, CESAR and the Esbjerg CO Capture Pilot Plant - Zero
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>CASTOR</strong> Project: Objectives <strong>and</strong> Main Data<br />
<strong>CASTOR</strong> – <strong>CO</strong> 2 from capture to storage<br />
4-year European integrated project (Feb 2004 – Jan 2008)<br />
<strong>CASTOR</strong><br />
Budget: ~16 M€ (EU funding: 8.5 M€)<br />
Objectives<br />
Reduce <strong>the</strong> cost of <strong>CO</strong> 2 post-combustion capture<br />
Contribute to <strong>the</strong> feasibility & acceptance of <strong>the</strong> geological storage concept<br />
Validate <strong>the</strong> concept on real site(s)<br />
<strong>Pilot</strong> plant testing for capture<br />
Detailed studies of future storage projects<br />
Doc. info<br />
2