CASTOR, CESAR and the Esbjerg CO Capture Pilot Plant - Zero
CASTOR, CESAR and the Esbjerg CO Capture Pilot Plant - Zero
CASTOR, CESAR and the Esbjerg CO Capture Pilot Plant - Zero
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
2 nd MEA Test: Solvent Flow Rate Optimisation<br />
Specific steam consumption <strong>and</strong> <strong>CO</strong> 2 recovery at stripper<br />
pressure 0.85 bar g <strong>and</strong> flue gas flow ≈5000 Nm 3 /h<br />
4,0<br />
Steam consumption<br />
<strong>CO</strong>2 recovery<br />
100<br />
Steam consumption (GJ/ton <strong>CO</strong> 2 )<br />
3,8<br />
3,6<br />
3,4<br />
3,2<br />
90<br />
80<br />
70<br />
60<br />
<strong>CO</strong> 2 recovery (%)<br />
3,0<br />
50<br />
1,5 2,0 2,5 3,0 3,5 4,0<br />
Absorber L/G ratio (kg/kg)<br />
Doc. info<br />
15