01.02.2015 Views

CASTOR, CESAR and the Esbjerg CO Capture Pilot Plant - Zero

CASTOR, CESAR and the Esbjerg CO Capture Pilot Plant - Zero

CASTOR, CESAR and the Esbjerg CO Capture Pilot Plant - Zero

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>CASTOR</strong> <strong>Pilot</strong> <strong>Plant</strong> Specifications<br />

<strong>Pilot</strong> plant erected <strong>and</strong> commissioned during 2005<br />

Design of pilot plant based on a commercial <strong>CO</strong> 2<br />

production plant (MEA)<br />

<strong>Pilot</strong> plant operates on a slip stream taken directly<br />

after <strong>the</strong> wet FGD<br />

Design flue gas conditions: ~47°C saturated,

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!