01.02.2015 Views

CASTOR, CESAR and the Esbjerg CO Capture Pilot Plant - Zero

CASTOR, CESAR and the Esbjerg CO Capture Pilot Plant - Zero

CASTOR, CESAR and the Esbjerg CO Capture Pilot Plant - Zero

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>CESAR</strong> Project Consortium<br />

<strong>CESAR</strong>: <strong>CO</strong> 2 Enhanced Separation And Recovery<br />

3-year EU project (2008 – 2011) in <strong>the</strong> 7 th Framework Programme<br />

Aim: To reduce <strong>the</strong> cost of <strong>CO</strong> 2 post-combustion capture<br />

R&D<br />

IFP (FR)<br />

TNO (NL)<br />

SINTEF (NO)<br />

NTNU (NO)<br />

POLYMEN (FR)<br />

CNRS (FR)<br />

U. KAISERSLAUTERN (DE)<br />

Oil & Gas<br />

STATOILHYDRO (NO)<br />

GDF (FR)<br />

Power Companies<br />

DONG Energy (DK)<br />

VATTENFALL (SE/DK)<br />

E.ON (DE/UK)<br />

ELECTRABEL (BE)<br />

RWE (DE/UK)<br />

PPC (GR)<br />

POWERGEN (UK)<br />

Manufacturers<br />

ALSTOM POWER (SE)<br />

DOOSAN BAB<strong>CO</strong>CK (UK)<br />

SIEMENS (DE)<br />

BASF (DE)<br />

Coordinator: TNO<br />

Doc. info<br />

23

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!