CASTOR, CESAR and the Esbjerg CO Capture Pilot Plant - Zero
CASTOR, CESAR and the Esbjerg CO Capture Pilot Plant - Zero
CASTOR, CESAR and the Esbjerg CO Capture Pilot Plant - Zero
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>CESAR</strong> Project Consortium<br />
<strong>CESAR</strong>: <strong>CO</strong> 2 Enhanced Separation And Recovery<br />
3-year EU project (2008 – 2011) in <strong>the</strong> 7 th Framework Programme<br />
Aim: To reduce <strong>the</strong> cost of <strong>CO</strong> 2 post-combustion capture<br />
R&D<br />
IFP (FR)<br />
TNO (NL)<br />
SINTEF (NO)<br />
NTNU (NO)<br />
POLYMEN (FR)<br />
CNRS (FR)<br />
U. KAISERSLAUTERN (DE)<br />
Oil & Gas<br />
STATOILHYDRO (NO)<br />
GDF (FR)<br />
Power Companies<br />
DONG Energy (DK)<br />
VATTENFALL (SE/DK)<br />
E.ON (DE/UK)<br />
ELECTRABEL (BE)<br />
RWE (DE/UK)<br />
PPC (GR)<br />
POWERGEN (UK)<br />
Manufacturers<br />
ALSTOM POWER (SE)<br />
DOOSAN BAB<strong>CO</strong>CK (UK)<br />
SIEMENS (DE)<br />
BASF (DE)<br />
Coordinator: TNO<br />
Doc. info<br />
23