egulations. Other features include energy efficient lighting, enhanced controls and variable speed<br />

pumps.<br />

57 Based on the information provided, the proposed development does not appear to achieve<br />

any carbon savings from energy efficiency alone compared to a 2010 Building Regulations<br />

compliant development.<br />

58 Using 2010 Building Regulations compliance software, the applicant should model, and<br />

commit to, additional measures that can be adopted to enable the development to exceed 2010<br />

Building Regulations compliance through energy efficiency alone.<br />

District heating<br />

59 A single site wide heat network providing heating to all new uses in the development is<br />

proposed. This will be fed from a single energy centre. A schematic showing the route of the heat<br />

network should be provided. Information on the location, floor area and layout of the energy<br />

centre should also be provided.<br />

60 It is not proposed to connect the existing town hall to the district heating network. The<br />

applicant should actively pursue connecting the existing town hall into the proposed development.<br />

Further details should be provided in this regard<br />

Combined heat and power<br />

61 Gas fired combined heat and power plant with an electrical capacity around 220kwe,<br />

operating in conjunction with thermal storage, is proposed as the lead heat source for the heat<br />

network. Heat load profiles have been provided indicating that the sizing of the unit has been<br />

optimised in relation to the new buildings. A reduction in carbon dioxide emissions of 265 tonnes<br />

per annum (25%) will be achieved through this second part of the energy hierarchy.<br />

62 The sizing of the combined heat and power unit should be revisited, taking into account<br />

connection of the existing town hall building if feasible.<br />

Cooling<br />

63 Passive design techniques including solar control glazing and shading measures have been<br />

adopted so that the need for active cooling is minimised. Penthouse apartments and commercial<br />

areas of the development will be provided with mechanical cooling but high efficiency electric<br />

chilling plant will be adopted.<br />

Renewable energy technologies<br />

64 A 240 sq.m. photovoltaic panel array is proposed to provide a contribution from renewable<br />

energy. A drawing has been provided indicating that the roof area allocated for the panels has<br />

been maximised, taking into account overshadowing and use of roof space for other requirements<br />

e.g. green roofs. A reduction in regulated carbon dioxide emissions of 10 tonnes per annum (1%)<br />

will be achieved through this third element of the energy hierarchy. On a whole energy basis, a<br />

reduction of 0.5% from renewable energy is proposed.<br />

Overview<br />

65 The estimated regulated carbon emissions of the development are 799 tonnes of carbon<br />

dioxide per year after the cumulative effect of energy efficiency measures, combined heat and<br />

power and renewable energy has been taken into account.<br />