Construction/servicing<br />
89 TfL understands that it is now unlikely that construction of the proposed development will<br />
coincide with the <strong>London</strong> 2012 Olympic and Paralymic Games. However, TfL reiterates its previous<br />
direction that the A4 forms part of the Olympic Route Network (ORN) and during 2012 there will<br />
be embargos on construction and associated traffic along the ORN.<br />
90 TfL requests submission of a construction logistics plan, which should seek to minimise<br />
highway and traffic impact on the highway network during the course of construction. These plans<br />
should be agreed by the Council and TfL. TfL also requests that delivery and servicing plan is<br />
produced to rationalise servicing vehicle movements to and from the site, this would help to<br />
minimise highway and traffic impact to the strategic road network in the vicinity of the site.<br />
91 It is satisfactory for both the construction logistics plan and delivery and servicing plan to<br />
be secured by condition. TfL would welcome further discussion on construction accesses and<br />
routes in order to ensure the application complies with <strong>London</strong> plan policy 3C.25 Freight strategy<br />
and draft replacement <strong>London</strong> Plan policy 6.14 Freight.<br />
Traffic Management Act<br />
92 Should this application be granted planning permission, the developer and their<br />
representatives are reminded that this does not discharge the requirements under the Traffic<br />
Management Act 2004. Formal notifications and approval may be needed for both the permanent<br />
highway scheme and any temporary highway works required during the construction phase of the<br />
development.<br />
Summary<br />
93 The application does not currently comply with the <strong>London</strong> Plan on transport grounds.<br />
There are a number of issues that should be addressed including: contributions towards LU<br />
capacity; bus stop accessibility improvements; a construction and logistics plan and delivery and<br />
servicing plan to be secured by condition; car parking and electric vehicle charging points; and a<br />
separate application and approval will be required for the footbridge over the A4.<br />
94 These issues should be addressed before TfL is in a position to provide a positive<br />
recommendation on the development proposals. TfL will also need to be involved at an early stage<br />
in the drafting of relevant planning conditions and section 106 obligations.<br />
Local planning authority’s position<br />
95 The officer recommendation is unknown.<br />
Legal considerations<br />
96 Under the arrangements set out in Article 4 of the <strong>Town</strong> and Country Planning (Mayor of<br />
<strong>London</strong>) Order 2008 the Mayor is required to provide the local planning authority with a statement<br />
setting out whether he considers that the application complies with the <strong>London</strong> Plan, and his<br />
reasons for taking that view. Unless notified otherwise by the Mayor, the Council must consult the<br />
Mayor again under Article 5 of the Order if it subsequently resolves to make a draft decision on the<br />
application, in order that the Mayor may decide whether to allow the draft decision to proceed<br />
unchanged, or direct the Council under Article 6 of the Order to refuse the application, or issue a<br />
direction under Article 7 of the Order that he is to act as the local planning authority for the<br />
purpose of determining the application and any connected application. There is no obligation at<br />