Independent Logistics Assessment Process Narratives<br />

23 May 2006<br />

Title: ILA Team Conducts Pre-ILA Planning Meeting (-60 Days)<br />

Number: 9<br />

During PMT ILA Brief, ILA team members will provide guidance and additional<br />

documentation requirements needed to assess supportability during the<br />

Independent Assessments. The team along with the PMT will determine the<br />

medium used to access ILA documentation.<br />

Exit criteria and findings from previous ILAs should be resolved prior to<br />

conducting another assessment.<br />

After completion of the ILA Brief, the ILA team members will assess whether the<br />

program should proceed with a formal ILA.