25.02.2015 Views

Acquire Support Subsystem - Marine Corps Systems Command

Acquire Support Subsystem - Marine Corps Systems Command

Acquire Support Subsystem - Marine Corps Systems Command

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

TEMPLATE FOR INDEPENDENT LOGISTICS ASSESSMENT<br />

MEMORANDUM<br />

From: Assistant <strong>Command</strong>er, Logistics<br />

To: Assistant <strong>Command</strong>er, Programs<br />

SSIC Code: 4105<br />

Office Code<br />

Date Signed<br />

Subj: INDEPENDENT LOGISTICS ASSESSMENT (ILA) CERTIFICATION<br />

FOR THE “PROGRAM NAME”<br />

Ref: (a) SECNAVINST 4105.1A<br />

Encl: (1) Attendance Roster<br />

(2) ILA Brief<br />

1. An ILA was conducted in support of the Program Name on<br />

Date. The ILA was accomplished per the reference. Enclosure<br />

(1) contains the list of attendees and enclosure (2)<br />

contains the program brief that includes discussion of<br />

applicable individual logistics elements. Name,<br />

Organization, chaired the ILA.<br />

(Note: Information only; do not insert this text. Regarding<br />

the ten (10) ILS Elements and ILS-related disciplines,<br />

identify ILA results using “stoplight” evaluations i.e.,<br />

RED (not-ready-to-proceed), YELLOW (conditionally ready-toproceed),<br />

or GREEN (ready-to-proceed). Identify<br />

deficiencies and any plans for remediation.<br />

2. Assessment Results<br />

a. The following logistical elements were reviewed and<br />

found to be GREEN with no outstanding issues.<br />

b. The following issues were found to be YELLOW with<br />

minor issues requiring resolution prior to fielding.<br />

c. The following logistical elements were reviewed and<br />

found to be RED with major outstanding issues.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!