d. PMs shall:<br />

(1) Ensure ILAs are conducted on their programs per<br />

enclosure (1) and enclosure (3), reference (c), and this policy.<br />

(2) When serving as MDA, execute all responsibilities<br />

assigned to the PGD in this policy.<br />

(3) Engage the SBT Logistician prior to informing the MDA<br />

of an upcoming milestone decision.<br />

e. ILA Team Leader shall:<br />

(1) Compile the ILAR using enclosure (2) as a guide.<br />

(2) Ensure that the ILAR identifies integrated logistics<br />

support and supportability factors assessed during the review.<br />

(3) Provide rationale for each area not assessed.<br />

(4) Sign the ILAR and certification memo and forward it<br />

to the MTA Lead and ACLOG.<br />

f. MTA Lead shall:<br />

(1) Include the ILAR as an appendix to the MTA.<br />

6. Applicability. This policy letter is not applicable to<br />

MCTSSA.<br />

Distribution: A<br />

W. D. CATTO