25.02.2015 Views

Acquire Support Subsystem - Marine Corps Systems Command

Acquire Support Subsystem - Marine Corps Systems Command

Acquire Support Subsystem - Marine Corps Systems Command

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

4105<br />

LOG<br />

15 May 06<br />

ACQUISITION POLICY LETTER NO. X-03<br />

From: <strong>Command</strong>ing General<br />

Subj: INDEPENDENT LOGISTICS ASSESSMENT (ILA) AND CERTIFICATION<br />

REQUIREMENTS<br />

Ref: (a) SECNAVINST 5000.2C<br />

(b) SECNAVINST 4105.1A<br />

(c) NAVSO P-3692<br />

(d) MCSC Milestone Decision Process (MDP) Guide<br />

Encl: (1) ILA Process<br />

(2) ILA Report (ILAR); Template for ILA<br />

(3) ILA Brief Template<br />

1. Purpose. To implement Department of Navy (DON) ILA policy<br />

in support of the <strong>Marine</strong> <strong>Corps</strong> <strong>Systems</strong> <strong>Command</strong> (MARCORSYSCOM)<br />

Milestone Team Assessment (MTA) Process.<br />

2. Background. References (a) through (c) provide guidance for<br />

planning, conducting, and reporting ILAs within the DON.<br />

Additionally, several recent initiatives have driven the need to<br />

revise current policy and procedures for establishing and<br />

conducting ILAs. These initiatives include the establishment of<br />

Product Groups composed of program centric teams, the<br />

implementation of the MTA process and teams to support the<br />

Milestone Decision Processes (MDP), reference (d) which<br />

represents DON guidance on ILAs, and codifying the Program<br />

Manager’s (PM’s) total life cycle management responsibilities.<br />

3. Policy. For all acquisition programs in which the <strong>Command</strong>ing<br />

General (CG), MARCORSYSCOM serves as the Milestone Decision<br />

Authority (MDA), the Assistant <strong>Command</strong>er, Logistics (ACLOG), or<br />

his designee, shall conduct ILAs to support Milestone B,<br />

Milestone C, and Full Rate Production decisions. For those<br />

programs in which MDA has been delegated to the Product Group<br />

Director (PGD), Strategic Business Team personnel will be<br />

responsible for conducting ILAs IAW DON and ACLOG Guidance. The<br />

ILA shall be considered an integral part of, or predecessor to,<br />

the MTA.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!