Acquire Support Subsystem - Marine Corps Systems Command
Acquire Support Subsystem - Marine Corps Systems Command
Acquire Support Subsystem - Marine Corps Systems Command
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
4105<br />
LOG<br />
15 May 06<br />
ACQUISITION POLICY LETTER NO. X-03<br />
From: <strong>Command</strong>ing General<br />
Subj: INDEPENDENT LOGISTICS ASSESSMENT (ILA) AND CERTIFICATION<br />
REQUIREMENTS<br />
Ref: (a) SECNAVINST 5000.2C<br />
(b) SECNAVINST 4105.1A<br />
(c) NAVSO P-3692<br />
(d) MCSC Milestone Decision Process (MDP) Guide<br />
Encl: (1) ILA Process<br />
(2) ILA Report (ILAR); Template for ILA<br />
(3) ILA Brief Template<br />
1. Purpose. To implement Department of Navy (DON) ILA policy<br />
in support of the <strong>Marine</strong> <strong>Corps</strong> <strong>Systems</strong> <strong>Command</strong> (MARCORSYSCOM)<br />
Milestone Team Assessment (MTA) Process.<br />
2. Background. References (a) through (c) provide guidance for<br />
planning, conducting, and reporting ILAs within the DON.<br />
Additionally, several recent initiatives have driven the need to<br />
revise current policy and procedures for establishing and<br />
conducting ILAs. These initiatives include the establishment of<br />
Product Groups composed of program centric teams, the<br />
implementation of the MTA process and teams to support the<br />
Milestone Decision Processes (MDP), reference (d) which<br />
represents DON guidance on ILAs, and codifying the Program<br />
Manager’s (PM’s) total life cycle management responsibilities.<br />
3. Policy. For all acquisition programs in which the <strong>Command</strong>ing<br />
General (CG), MARCORSYSCOM serves as the Milestone Decision<br />
Authority (MDA), the Assistant <strong>Command</strong>er, Logistics (ACLOG), or<br />
his designee, shall conduct ILAs to support Milestone B,<br />
Milestone C, and Full Rate Production decisions. For those<br />
programs in which MDA has been delegated to the Product Group<br />
Director (PGD), Strategic Business Team personnel will be<br />
responsible for conducting ILAs IAW DON and ACLOG Guidance. The<br />
ILA shall be considered an integral part of, or predecessor to,<br />
the MTA.