âWires-onlyâ VDSL2 Modem Test Plan - NICC
âWires-onlyâ VDSL2 Modem Test Plan - NICC
âWires-onlyâ VDSL2 Modem Test Plan - NICC
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
12<br />
<strong>NICC</strong> ND 1436 V1.1.2 (2013-09)<br />
downstream PSD shaping and upstream power back-off as defined in G.997.1 [10] and G.993.2<br />
[3].<br />
<strong>Test</strong><br />
Compliance shall be determined by the tests defined in the ANO and MPF provider-specific<br />
annexes to this document.<br />
6.1.3 Bandplan<br />
Requirement<br />
ND1031 [11] Reference : 5.2.1.3.<br />
The CP provided modem shall support operation that complies with the current MPF provider<br />
ANFPs [6], [12].<br />
<strong>Test</strong><br />
Compliance shall be determined by the tests defined in the ANO and MPF provider-specific<br />
annexes to this document.<br />
6.1.4 ANFP<br />
Requirement<br />
ND1031 [11] Reference : 5.2.1.3.<br />
The CPE modem shall comply with the relevant requirements of the current MPF provider-specific<br />
ANFP documents [6], [12] in <strong>VDSL2</strong> operating mode.<br />
Note : The tests specified in the ANFPs currently cover static UPBO only. <strong>Test</strong>s for dynamic UPBO<br />
are defined in the MPF Provider-specific annexes to this document if required.<br />
<strong>Test</strong><br />
Compliance shall be determined by the tests defined in the MPF provider-specific annexes to this<br />
document.<br />
6.1.5 Bit Swap<br />
Requirement<br />
ND1031 [11] Reference : 5.2.1.4.<br />
The CP provided modem shall support bit swap as defined in G.993.2 [3].<br />
<strong>Test</strong><br />
Compliance shall be determined by the test specified in Annex A.1.<br />
<strong>NICC</strong> Standards Limited