15.03.2015 Views

“Wires-only” VDSL2 Modem Test Plan - NICC

“Wires-only” VDSL2 Modem Test Plan - NICC

“Wires-only” VDSL2 Modem Test Plan - NICC

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

12<br />

<strong>NICC</strong> ND 1436 V1.1.2 (2013-09)<br />

downstream PSD shaping and upstream power back-off as defined in G.997.1 [10] and G.993.2<br />

[3].<br />

<strong>Test</strong><br />

Compliance shall be determined by the tests defined in the ANO and MPF provider-specific<br />

annexes to this document.<br />

6.1.3 Bandplan<br />

Requirement<br />

ND1031 [11] Reference : 5.2.1.3.<br />

The CP provided modem shall support operation that complies with the current MPF provider<br />

ANFPs [6], [12].<br />

<strong>Test</strong><br />

Compliance shall be determined by the tests defined in the ANO and MPF provider-specific<br />

annexes to this document.<br />

6.1.4 ANFP<br />

Requirement<br />

ND1031 [11] Reference : 5.2.1.3.<br />

The CPE modem shall comply with the relevant requirements of the current MPF provider-specific<br />

ANFP documents [6], [12] in <strong>VDSL2</strong> operating mode.<br />

Note : The tests specified in the ANFPs currently cover static UPBO only. <strong>Test</strong>s for dynamic UPBO<br />

are defined in the MPF Provider-specific annexes to this document if required.<br />

<strong>Test</strong><br />

Compliance shall be determined by the tests defined in the MPF provider-specific annexes to this<br />

document.<br />

6.1.5 Bit Swap<br />

Requirement<br />

ND1031 [11] Reference : 5.2.1.4.<br />

The CP provided modem shall support bit swap as defined in G.993.2 [3].<br />

<strong>Test</strong><br />

Compliance shall be determined by the test specified in Annex A.1.<br />

<strong>NICC</strong> Standards Limited

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!