Mid-term Review of the Diakonia Strategic Peace Building ... - Sida
Mid-term Review of the Diakonia Strategic Peace Building ... - Sida
Mid-term Review of the Diakonia Strategic Peace Building ... - Sida
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
A N N E X 2 – I N C E P T I O N R E P O R T<br />
Annex 2 – Preliminary Work Plan and Schedule<br />
Date Time Activity Place Participants<br />
28-01-2013 - Inception phase<br />
Stockholm JG<br />
04-02-2013<br />
04-02-2013 Inception report delivered JR, JG<br />
04.02.2013-<br />
13.02.2013<br />
Desk study<br />
Prepare plans for field visits:<br />
contact with <strong>Diakonia</strong><br />
and <strong>Sida</strong> in Harare<br />
JG<br />
JG, <strong>Diakonia</strong><br />
JG<br />
Finalising interview questions<br />
14.02.2013 -<br />
24.02.2013<br />
Field visit<br />
JG<br />
22.02.2013 Debriefing: sharing <strong>of</strong> preliminary<br />
findings and lessons,<br />
and joint reflection<br />
23.02.2013-<br />
28.01.2013<br />
Report writing<br />
Quality assurance by Indevelop<br />
JR, IC<br />
28.02.2013 Submission <strong>of</strong> draft report JR, JG<br />
05.03.2013 Comments on draft report <strong>Sida</strong><br />
Quality assurance by Indevelop<br />
JR, IC<br />
11.03.2013 Submission <strong>of</strong> final report JR, JG<br />
JG<br />
<strong>Diakonia</strong><br />
Embassy <strong>of</strong><br />
Sweden in Harare<br />
JG, JE<br />
48