Feasibility Assessment for the Replacement of Diesel Pumps with <strong>Solar</strong> Pumps<br />

<strong>FINAL</strong> <strong>REPORT</strong>: September 2006<br />

A2 Cost modelling inputs<br />

User information<br />

Comparative <strong>PV</strong> Pumping and Diesel Pumping Costing Tool for <strong>Namibia</strong><br />

Commissioned by Ministry of Mines and Energy<br />

for the<br />

Barrier Removal to <strong>Namibia</strong>n Renewable Energy Programme (NAMREP)<br />

with acknowledgements to<br />

<strong>UNDP</strong>/GEF<br />

developed by Emcon Consulting Group<br />

[Email: axel@emcongroup.com]<br />

Costing Tool for <strong>Solar</strong> & Diesel <strong>water</strong> <strong>pumping</strong> Ver 2006 Rev 0<br />

USER INFORMATION<br />

OUTPUT OF THE COSTING TOOL<br />

USING THE COSTING SPREADSHEET<br />

RESULTS<br />

MAINTENANCE AND REPLACEMENT<br />

GLOBAL PARAMETERS<br />

VARIABLES<br />

DATA LOCATION<br />

NOTES ON FORMULAE'S USED<br />

FINANCIAL DEFINITIONS<br />

ASSUMPTIONS<br />

ERRORS AND DISCREPANCIES<br />

ISSUES TO ADDRESS ONE FINE DAY<br />

COLOUR CODES<br />

Diagramtic overview of spreadsheet<br />

<strong>Solar</strong> pump<br />

Start<br />

Diesel Pump<br />

Performance<br />

Function of:<br />

• <strong>PV</strong>P model<br />

• Performance at heads<br />

of 10m, 20m, 30m …<br />

200m<br />

• Wpeak as fn of daily<br />

flowrate<br />

• 6kWh/m2 Function of:<br />

• <strong>PV</strong>P model<br />

• Performance at heads<br />

of 10m, 20m, 30m …<br />

200m<br />

• Wpeak as f<br />

/day<br />

n of daily<br />

flowrate<br />

• 6kWh/m2 /day<br />

Watt peak<br />

Selection of head<br />

& daily flowrate<br />

Engine size<br />

Function of:<br />

• Pump efficiency<br />

• Rising main losses<br />

• Windage losses<br />

• Derating<br />

• Load factor<br />

Capital<br />

cost<br />

Function of:<br />

• System selected<br />

• Head<br />

• Daily flowrate<br />

• RWS or PRIVATE<br />

• Distance to site<br />

• Watt peak<br />

Capital cost<br />

Function of:<br />

• Quality selected<br />

• Head<br />

• Pumping schedule<br />

• Hourly flowrate<br />

• RWS or PRIVATE<br />

• Distance to site<br />

• Engine size<br />

Operating<br />

cost<br />

Function of:<br />

• RWS or PRIVATE<br />

• Distance to pump<br />

Operating cost<br />

Function of:<br />

• RWS or PRIVATE<br />

• Fuel consumption<br />

• Cost of fuel transport<br />

• Distance to pump<br />

M&R<br />

cost<br />

Function of:<br />

• Years of operation<br />

• RWS or PRIVATE<br />

• Labour<br />

• Transport<br />

M&R cost<br />

Function of:<br />

• Hours of operation<br />

• RWS or PRIVATE<br />

• Labour<br />

• Transport<br />

Results<br />

Function of:<br />

• Project life<br />

• Discount rate<br />

• Inflation rate<br />

Life Cycle Cost<br />

Breakeven<br />

Unit Water Cost<br />

Function of:<br />

• Project life<br />

• Discount rate<br />

• Inflation rate<br />

• Diesel escalation<br />

rate<br />

Page 54 of 76