HERRENKNECHT | TRAFFIC TUNNELLING<br />
SALES.NET<br />
PROJECT DATASHEET. Updated: 12/3/2008<br />
S-Number:<br />
Name:<br />
Location:<br />
Country:<br />
S-349<br />
Nanjing<br />
Nanjing<br />
China<br />
.<br />
MAIN GEOLOGY CONTRACT TBM SPEC. TBM PROGRESS BACKGROUND .<br />
.<br />
S-Number: S-349 .<br />
Project Name: Nanjing .<br />
Lot: Right Tunnel .<br />
Location: Nanjing .<br />
Country: China .<br />
Sales Region: Asia Pacific .<br />
Diameter: 14930 mm .<br />
Total Tunnel Length: 2933 m .<br />
Machine Type: Mixshield .<br />
Employment: Road .<br />
Project Status: Tunnelling .<br />
. . .<br />
.<br />
MAIN GEOLOGY CONTRACT TBM SPEC. TBM PROGRESS BACKGROUND .<br />
.<br />
Min. Overburden:<br />
6 m<br />
Max. Overburden:<br />
30 m<br />
Max. Op. Pressure:<br />
7.5 bar<br />
Geology:<br />
Silt, sand, clay, gravel<br />
.<br />
.<br />
1