HERRENKNECHT | TRAFFIC TUNNELLING<br />
SALES.NET<br />
PROJECT DATASHEET. Updated: 12/19/2008<br />
S-Number:<br />
Name:<br />
Location:<br />
Country:<br />
S-534<br />
Sotschi Straßentunnel Nr.3<br />
Sochi<br />
Russia<br />
.<br />
MAIN GEOLOGY CONTRACT TBM SPEC. TBM PROGRESS BACKGROUND .<br />
.<br />
S-Number: S-534<br />
Project Name:<br />
Sotschi Straßentunnel Nr.3<br />
Lot:<br />
Adler - Krasnaja Poljana<br />
Location:<br />
Sochi<br />
Country:<br />
Russia<br />
Sales Region:<br />
Europe<br />
Diameter:<br />
13210 mm<br />
Total Tunnel Length:<br />
4200 m<br />
Machine Type:<br />
Single Shield TBM<br />
Employment:<br />
Road<br />
Project Status:<br />
Contract<br />
.<br />
.<br />
MAIN GEOLOGY CONTRACT TBM SPEC. TBM PROGRESS BACKGROUND .<br />
.<br />
Geology:<br />
Limestone<br />
.<br />
.<br />
1