HERRENKNECHT | TRAFFIC TUNNELLING<br />
SALES.NET<br />
PROJECT DATASHEET. Updated: 9/4/2008<br />
S-Number:<br />
Name:<br />
Location:<br />
Country:<br />
S-317<br />
Shanghai Changjiang Under River Tunnel Project<br />
Shanghai<br />
China<br />
.<br />
MAIN GEOLOGY CONTRACT TBM SPEC. TBM PROGRESS BACKGROUND .<br />
.<br />
S-Number: S-317 .<br />
Project Name:<br />
Shanghai Changjiang Under<br />
River Tunnel Project<br />
.<br />
Lot: Chongming .<br />
Location: Shanghai .<br />
Country: China .<br />
Sales Region: Asia Pacific .<br />
Diameter: 15430 mm .<br />
Total Tunnel Length: 7472 m .<br />
Machine Type: Mixshield .<br />
Employment: Road .<br />
Project Status: Finished .<br />
. . .<br />
.<br />
MAIN GEOLOGY CONTRACT TBM SPEC. TBM PROGRESS BACKGROUND .<br />
.<br />
Min. Overburden:<br />
20 m<br />
Max. Overburden:<br />
23 m<br />
Max. Op. Pressure:<br />
6 bar<br />
Geology:<br />
Sand, clay, rubble<br />
.<br />
.<br />