22.04.2015 Views

Draft London Safety Plan 2010/2013 - Fire Brigades Union London

Draft London Safety Plan 2010/2013 - Fire Brigades Union London

Draft London Safety Plan 2010/2013 - Fire Brigades Union London

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

What we said we would do during 2009/10<br />

25 <strong>Plan</strong>ning the delivery of an operational response for the<br />

management of safety and risk at all venues<br />

What we have done so far<br />

Proposals for meeting command and control requirements are being drafted. Initial meeting with other blue<br />

light services indicates that all three services’ command and control plans will dovetail. <strong>Plan</strong>s for staffing the<br />

National Olympic Co-ordination Centre are being drafted following attendance at a multi agency project<br />

board meeting.<br />

Operational planning proceeding based on concept of operations principles. Olympic Security <strong>Safety</strong> Risk<br />

Assessment released following Ministerial sign off, hazards and threats identified being incorporated into<br />

planning assumptions. Work ongoing with the <strong>London</strong> Organising Committee of the Olympic Games<br />

(LOCOG) on development of concept of operations for the Olympic Park and as part of Venue Operational<br />

<strong>Plan</strong>ning Process.<br />

26 <strong>Plan</strong>ning the delivery of a co-ordinated community<br />

safety and fire safety regulation programme to reflect<br />

the numbers and diversity of the population growth in<br />

<strong>London</strong> and the surrounding areas for the Olympic<br />

period<br />

27 Ensuring that the development of all Olympic venues<br />

incorporates the best fire safety engineering providing<br />

design freedoms to promote safety, innovation and<br />

value<br />

Involved in Community Relationships and Prevent projects from the Olympic <strong>Safety</strong> and Security<br />

Programme. Full time personnel in place developing CS strategy for the Olympics.<br />

Involved in consultation and FSR work at all Olympic venues under construction ensuring suitable fire<br />

service access and suitable water supplies to and around the Olympic Park and all Olympic venues.<br />

Attend <strong>Safety</strong> Advisory Groups for all Olympic venues meetings and deal with matters that arise from it.<br />

Work has now spread outside of the Olympic Park with initial planning taking place for an external venue<br />

(Greenwich Park).<br />

AIM 3 RESPONSE – <strong>Plan</strong>ning and preparing for emergencies that may happen, and making a high quality, effective and resilience response to them<br />

28 Roll out of the new national digital radio scheme<br />

(<strong>Fire</strong>Link) for the fire and rescue service in <strong>London</strong><br />

Senior officer radios operational as of 3 August 2009. Appliance Radio and Mobile Data Terminal (MDT)<br />

fitment commenced 3 August 2009 and is expected to be completed March <strong>2010</strong>.<br />

60

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!