Draft London Safety Plan 2010/2013 - Fire Brigades Union London
Draft London Safety Plan 2010/2013 - Fire Brigades Union London
Draft London Safety Plan 2010/2013 - Fire Brigades Union London
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
What we said we would do during 2009/10<br />
63 Introduce a pilot scheme for funded treatment to<br />
reduce staff absence due to waiting time for operations<br />
64 Introduce alcohol and drugs testing to improve staff and<br />
public safety and reduce absenteeism<br />
65 Implement a comprehensive staff management strategy<br />
for developing the high potential and ability of our<br />
workforce, including development of our successful<br />
graduate entry scheme and targeted development<br />
programmes<br />
66 Develop new reward proposals for salary progression<br />
linked to performance and implement the first stage for<br />
the Top Management Group<br />
67 Implement new working patterns for our operational<br />
station based staff<br />
68 Implement a revised car scheme based on reducing<br />
carbon emissions<br />
69 Implement our e-hr strategy delivering increasing HR<br />
services on line<br />
What we have done so far<br />
Facility for funded treatment introduced. Report back on its operation due in June <strong>2010</strong>.<br />
Collective agreement now reached with FBU on Routine Periodical Medical (RPM), for cause, and random<br />
testing; all to be implemented from 1 October onwards.<br />
<strong>Plan</strong> for Strategic Manager Targeted Development Programme (TDP) to be put forward by end of March<br />
<strong>2010</strong>.<br />
359 applications received for Graduate entry, 40% of which are from under-represented groups.<br />
14 appointments made for targeted development, 6 (43%) of which are from under-represented groups.<br />
The Pay Strategy is due to go to the Authority on 19 November 2009.<br />
See comments on monitoring report against action 54 above.<br />
Revised car scheme agreed at Authority. Consultation now taking place with representative bodies.<br />
Good progress being made.<br />
AIM 6 PRINCIPLES – Operating in accordance with our values and ensuring that safety, sustainability, partnership and diversity run through all of our<br />
activities<br />
67