29.04.2015 Views

Solas Consolidated Edition 2009.pdf

Solas Consolidated Edition 2009 for maritime

Solas Consolidated Edition 2009 for maritime

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Chapter II-l: Construction - structure, stability, installations<br />

Contents<br />

Part B-2 - Subdivision, watertight and weathertight integrity<br />

9 Double bottoms in passenger ships and cargo ships other than tankers 52<br />

10 Construction of watertight bulkheads 53<br />

11 Initial testing of watertight bulkheads, etc 53<br />

12 Peak and machinery space bulkheads, shaft tunnels, etc 54<br />

13 Openings in watertight bulkheads below the bulkhead deck in passenger ships 55<br />

13-1 Openings in watertight bulkheads and internal decks in cargo ships 58<br />

14 Passenger ships carrying goods vehicles and accompanying personnel 59<br />

15 Openings in the shell plating below the bulkhead deck of passenger ships and<br />

the freeboard deck of cargo ships 59<br />

15-1 External openings in cargo ships 60<br />

16 Construction and initial tests of watertight doors, sidescuttles, etc 61<br />

16-1 Construction and initial tests of watertight decks, trunks, etc 61<br />

17 Internal watertight integrity of passenger ships above the bulkhead deck 61<br />

17-1 Integrity of the hull and superstructure, damage prevention and control on<br />

ro—ro passenger ships 62<br />

Part B-3 - Subdivision load line assignment for passenger ships<br />

18 Assigning, marking and recording of subdivision load lines for passenger ships 63<br />

Part B-4 - Stability management<br />

19 Damage control information 64<br />

20 Loading of passenger ships 64<br />

21 Periodical operation and inspection of watertight doors, etc., in passenger ships.......................................... 64<br />

22 Prevention and control of water ingress, etc 65<br />

22-1 Flooding detection systems for passenger ships carrying 36 or more persons constructed<br />

on or after 1 July 2010 66<br />

23 Special requirements for ro—ro passenger ships 67<br />

24 Prevention and control of water ingress, etc., in cargo ships 67<br />

25 Water level detectors on single hold cargo ships other than bulk carriers 67<br />

Part C - Machinery installations<br />

26 General 69<br />

27 Machinery 70<br />

28 Means of going astern 71<br />

29 Steering gear 71<br />

30 Additional requirements for electric and electrohydraulic steering gear 75<br />

28

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!