ADDITIONAL CONDITIONS & SPECIFICATION <strong>BSNL</strong><br />
2.15.1.1. Samples of typical portion of the works of repetitive nature such as typical<br />
room, toilet room, or any other work shall be prepared by the contractor<br />
under the directions and to the satisfaction of Engineer-in-Charge and got<br />
approved from him in writing before the commencement of these items for<br />
the entire work.<br />
2.15.1.2. The work shall be so arranged to be carried out that the requirement for<br />
preparation of samples are observed and fulfilled without any detriment to the<br />
general progress of work. In other words, this will not be allowed to have any<br />
effect on the general progress of work or on any of the terms and conditions<br />
of the contract. <strong>No</strong> claims of any kind whatsoever including the claim of<br />
extension of time will be entertained due to the incorporation of this<br />
requirement.<br />
2.16. FLOOR TEST FOR TELEPHONE EXCHANGE BUILDINGS:-The floor of<br />
Technical rooms in the T.E. buildings shall be laid in such a way that the limits in<br />
floor levels would not be exceeded as follows.<br />
i) The levels at any places when checked over a distance of one metre in<br />
any direction would not show variation in floor levels in excess of 3mm.<br />
ii) The levels if checked over a distance of 4 metres in any direction shall not<br />
to exceed 5mm.<br />
iii) The maximum permissible variation in the levels at any two points more<br />
than 4 meters away in any direction in the same room shall not be more<br />
than 8mm.<br />
iv) Floor levels shall be taken at every metre and recorded in a “Level chart”<br />
for flooring in all technical room. This shall be checked, prepared and<br />
certified by the Assistant to Engineer-in-Charge of the work and contractor.<br />
This level chart shall be checked by the Engineer-in-Charge of work to<br />
satisfy himself that levels in the floors of technical rooms are with in the<br />
variation limits laid down at I) to iii) above.<br />
2.16.1. <strong>No</strong> payment of flooring in Technical room shall be allowed till “Level Chart” is<br />
prepared and meets the requirements of levels mentioned above.<br />
2.17. TEST RESULTS & RELATED ASPECTS<br />
2.17.1. <strong>No</strong>rmally, part-rate payment shall be allowed in the running account bills only if<br />
the materials conforming to the CPWD specifications for works as mentioned<br />
in the work are used and test results are awaited by the Engineer-in-Charge.<br />
2.17.2. The Engineer-in-Charge of work shall check the test results and satisfy himself<br />
before allowing any payment in the running/final bill.<br />
2.18. WATER PROOFING: -