16.11.2012 Views

NOTICE INVITING TENDER BSNL I N D E X Sl No Details ... - Tenders

NOTICE INVITING TENDER BSNL I N D E X Sl No Details ... - Tenders

NOTICE INVITING TENDER BSNL I N D E X Sl No Details ... - Tenders

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

ADDITIONAL CONDITIONS & SPECIFICATION <strong>BSNL</strong><br />

2.15.1.1. Samples of typical portion of the works of repetitive nature such as typical<br />

room, toilet room, or any other work shall be prepared by the contractor<br />

under the directions and to the satisfaction of Engineer-in-Charge and got<br />

approved from him in writing before the commencement of these items for<br />

the entire work.<br />

2.15.1.2. The work shall be so arranged to be carried out that the requirement for<br />

preparation of samples are observed and fulfilled without any detriment to the<br />

general progress of work. In other words, this will not be allowed to have any<br />

effect on the general progress of work or on any of the terms and conditions<br />

of the contract. <strong>No</strong> claims of any kind whatsoever including the claim of<br />

extension of time will be entertained due to the incorporation of this<br />

requirement.<br />

2.16. FLOOR TEST FOR TELEPHONE EXCHANGE BUILDINGS:-The floor of<br />

Technical rooms in the T.E. buildings shall be laid in such a way that the limits in<br />

floor levels would not be exceeded as follows.<br />

i) The levels at any places when checked over a distance of one metre in<br />

any direction would not show variation in floor levels in excess of 3mm.<br />

ii) The levels if checked over a distance of 4 metres in any direction shall not<br />

to exceed 5mm.<br />

iii) The maximum permissible variation in the levels at any two points more<br />

than 4 meters away in any direction in the same room shall not be more<br />

than 8mm.<br />

iv) Floor levels shall be taken at every metre and recorded in a “Level chart”<br />

for flooring in all technical room. This shall be checked, prepared and<br />

certified by the Assistant to Engineer-in-Charge of the work and contractor.<br />

This level chart shall be checked by the Engineer-in-Charge of work to<br />

satisfy himself that levels in the floors of technical rooms are with in the<br />

variation limits laid down at I) to iii) above.<br />

2.16.1. <strong>No</strong> payment of flooring in Technical room shall be allowed till “Level Chart” is<br />

prepared and meets the requirements of levels mentioned above.<br />

2.17. TEST RESULTS & RELATED ASPECTS<br />

2.17.1. <strong>No</strong>rmally, part-rate payment shall be allowed in the running account bills only if<br />

the materials conforming to the CPWD specifications for works as mentioned<br />

in the work are used and test results are awaited by the Engineer-in-Charge.<br />

2.17.2. The Engineer-in-Charge of work shall check the test results and satisfy himself<br />

before allowing any payment in the running/final bill.<br />

2.18. WATER PROOFING: -

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!