ADDITIONAL CONDITIONS & SPECIFICATION <strong>BSNL</strong><br />
SPECIFIC CONDITIONS<br />
1. The intending bidders are advised to visit the site to acquaint themselves of the site<br />
conditions before quoting for the work.<br />
2. Local taxes, Octroi, Sales Tax etc. if any, will have to be borne by the agency and the<br />
<strong>BSNL</strong> shall not be responsible for reimbursement of the same.<br />
3. While quoting the item rate tender the intending tenderer need not quote anything<br />
extra on account of Service Tax. If the successful tenderer paid any Service Tax for this<br />
work, the same shall be reimbursed on production of documentary evidence for<br />
having paid the Service Tax to the Customs and Excise Department, Government of<br />
India on 10 th of succeeding month without fail. This is mandatory for releasing the<br />
Security Deposit<br />
4. The Executive Engineer reserves the right to alter the scope of work after issue of work<br />
order subject to exigencies and execute the work at any other sites under the<br />
respective Division at same terms and conditions.<br />
5. The rate indicated in the tender is net and is applicable to all locations irrespective of<br />
the terrain and quantity. The rate shall remain firm during the currency of the contract.<br />
6. <strong>No</strong>ne of the contractor’s representatives / workers will be permitted to stay in any of<br />
the working place beyond the normal working hours. In case where the work has to<br />
be carried out beyond normal working hours prior permission shall be obtained in<br />
writing from the competent authority.<br />
7. All tools and plants required for the work will have to be arranged by the contractor<br />
and shall readily be available at the site of work.<br />
8. Adequate care shall be taken while executing the work at the working exchange /<br />
office by providing safety precautions for men and materials working thereon. The<br />
contractor shall ensure minimum inconvenience to the staff / general public while<br />
carrying out the work assigned.<br />
9. The Executive Engineer shall have the right to get tested the materials according to<br />
specifications and the contractor shall have to replace the materials that do not satisfy<br />
the specifications at no extra cost.<br />
10. The quantity in the Schedule annexed to the tender is approximate and subject to<br />
change. <strong>No</strong> compensation is payable in case the quantity indicated is not executed.<br />
11. Contractor shall as soon as the contract is awarded, submit a programe chart for each<br />
items of work, like supply, erection, painting etc. and get it approved by the Engineer-