- Page 1 and 2: PROGRAM OUTLINE Heavy Equipment Ope
- Page 3 and 4: HEAVY EQUIPMENT OPERATOR PROGRAM OU
- Page 5 and 6: LINE F: OPERATE HAUL TRUCK ........
- Page 7 and 8: ACKNOWLEDGEMENTS The Core HEO Progr
- Page 9 and 10: PROGRAM FLOW CHART Phase 1 Prerequi
- Page 11 and 12: Program Overview HEAVY EQUIPMENT OP
- Page 13: Program Overview F. Operate Articul
- Page 17 and 18: Program Overview M7 W M9 W Manoeuvr
- Page 19 and 20: SECTION 2 HEAVY EQUIPMENT OPERATOR
- Page 21 and 22: B: Core - Essential Heavy Equipment
- Page 23 and 24: D: Core - Job Control & Engineering
- Page 25 and 26: F: Operate Articulated Haul Truck L
- Page 27 and 28: G: Operate Loader Line G Operate: L
- Page 29 and 30: H: Operate Backhoe (Optional In-Sch
- Page 31 and 32: I: Operate Dozer Line I Operate: DO
- Page 33 and 34: J: Operate Excavator Line J Operate
- Page 35 and 36: K: Operate Grader(Optional In-Schoo
- Page 37 and 38: Perform basic moves with equipment
- Page 39 and 40: 2. To complete the in school practi
- Page 41 and 42: Perform basic moves with equipment
- Page 43 and 44: 3. To complete the in school practi
- Page 45 and 46: P: Operate Dangle Head Processor Li
- Page 47 and 48: Q: Operate Log Loader Line Q Operat
- Page 49 and 50: LINE A: WORKSITE HEALTH AND SAFETY
- Page 51 and 52: LINE A: WORKSITE HEALTH AND SAFETY
- Page 53 and 54: LINE A: WORKSITE HEALTH AND SAFETY
- Page 55 and 56: LINE A: WORKSITE HEALTH AND SAFETY
- Page 57 and 58: LINE A: WORKSITE HEALTH AND SAFETY
- Page 59 and 60: LINE A: WORKSITE HEALTH AND SAFETY
- Page 61 and 62: LINE A: WORKSITE HEALTH AND SAFETY
- Page 63 and 64: LINE A: WORKSITE HEALTH AND SAFETY
- Page 65 and 66:
LINE B: ESSENTIAL HEAVY EQUIPMENT K
- Page 67 and 68:
LINE B: ESSENTIAL HEAVY EQUIPMENT K
- Page 69 and 70:
compressors (gas or electric) gene
- Page 71 and 72:
LINE B: ESSENTIAL HEAVY EQUIPMENT K
- Page 73 and 74:
LINE B: ESSENTIAL HEAVY EQUIPMENT K
- Page 75 and 76:
LINE B: ESSENTIAL HEAVY EQUIPMENT K
- Page 77 and 78:
4 Describe grapple yarders 5 Descri
- Page 79 and 80:
LINE B: ESSENTIAL HEAVY EQUIPMENT K
- Page 81 and 82:
3 Describe skills and attributes so
- Page 83 and 84:
LINE D: JOB CONTROL AND ENGINEERING
- Page 85 and 86:
of structures create offset layout
- Page 87 and 88:
3 Control the creation of slope Lea
- Page 89 and 90:
2 Interpret stakes 3 Use layout to
- Page 91 and 92:
significant hazard in event of rupt
- Page 93 and 94:
LINE D: JOB CONTROL AND ENGINEERING
- Page 95 and 96:
LINE D: JOB CONTROL AND ENGINEERING
- Page 97 and 98:
LINE D: JOB CONTROL AND ENGINEERING
- Page 99 and 100:
LINE D: JOB CONTROL AND ENGINEERING
- Page 101 and 102:
Achievement Criteria: Students wil
- Page 103 and 104:
Achievement Criteria: Students wil
- Page 105 and 106:
LINE D: JOB CONTROL AND ENGINEERING
- Page 107 and 108:
4 Describe environmental concerns r
- Page 109 and 110:
2 3 4 Describe types and potential
- Page 111 and 112:
plan for flood events, high rainfal
- Page 113 and 114:
5 Use Personal Protective Equipment
- Page 115 and 116:
4 Monitor performance of equipment
- Page 117 and 118:
attery terminals 6 Housekeeping ga
- Page 119 and 120:
LINE F: OPERATE HAUL TRUCK Competen
- Page 121 and 122:
Achievement Criteria: General: Vis
- Page 123 and 124:
dumping handle transmission approp
- Page 125 and 126:
Achievement Criteria: Students wil
- Page 127 and 128:
3 Perform shutdown procedures safe
- Page 129 and 130:
3 4 5 6 7 Drain air system reservoi
- Page 131 and 132:
LINE G: OPERATE LOADER Competency:
- Page 133 and 134:
LINE G: OPERATE LOADER Competency:
- Page 135 and 136:
LINE G: OPERATE LOADER Competency:
- Page 137 and 138:
LINE G: OPERATE LOADER Competency:
- Page 139 and 140:
LINE G: OPERATE LOADER Competency:
- Page 141 and 142:
LINE G: OPERATE LOADER Competency:
- Page 143 and 144:
Achievement Criteria: General: Vis
- Page 145 and 146:
LINE H: OPERATE BACKHOE Competency:
- Page 147 and 148:
LINE H: OPERATE BACKHOE Competency:
- Page 149 and 150:
LINE H: OPERATE BACKHOE Competency:
- Page 151 and 152:
LINE H: OPERATE BACKHOE Competency:
- Page 153 and 154:
Suggested Assessment: Time and qua
- Page 155 and 156:
Specific to this task: Consistent,
- Page 157 and 158:
Suggested Assessment: In a period
- Page 159 and 160:
Achievement Criteria: General: Stu
- Page 161 and 162:
Achievement Criteria: General: Stu
- Page 163 and 164:
6 Excavate service trenches, etc o
- Page 165 and 166:
5 Build a legal load This is the t
- Page 167 and 168:
LINE H: OPERATE BACKHOE Competency:
- Page 169 and 170:
LINE H: OPERATE BACKHOE Competency:
- Page 171 and 172:
LINE I: OPERATE DOZER Competency: I
- Page 173 and 174:
LINE I: OPERATE DOZER Competency: I
- Page 175 and 176:
LINE I: OPERATE DOZER Competency: I
- Page 177 and 178:
LINE I: OPERATE DOZER Competency: I
- Page 179 and 180:
Specific to this task: To complete
- Page 181 and 182:
Plans and conducts work with minima
- Page 183 and 184:
Achievement Criteria: General: Vis
- Page 185 and 186:
General: Visual checks, constant a
- Page 187 and 188:
LINE I: OPERATE DOZER Competency: I
- Page 189 and 190:
LINE I: OPERATE DOZER Competency: I
- Page 191 and 192:
LINE I: OPERATE DOZER Competency: I
- Page 193 and 194:
LINE I: OPERATE DOZER Competency: I
- Page 195 and 196:
5 Use Personal Protective Equipment
- Page 197 and 198:
shutdown required? Achievement Crit
- Page 199 and 200:
6 Adjust track tension as required
- Page 201 and 202:
LINE J: OPERATE EXCAVATOR Competenc
- Page 203 and 204:
Perform basic moves with equipment
- Page 205 and 206:
Achievement Criteria: General: Vis
- Page 207 and 208:
4 Grade area finish grading is acc
- Page 209 and 210:
Achievement Criteria: General: Vis
- Page 211 and 212:
Achievement Criteria: General: Vis
- Page 213 and 214:
the angle of the slope is accomplis
- Page 215 and 216:
4 Communicate truck placement for
- Page 217 and 218:
LINE J: OPERATE EXCAVATOR Competenc
- Page 219 and 220:
LINE J: OPERATE EXCAVATOR Competenc
- Page 221 and 222:
Specific to this task: Trenching:
- Page 223 and 224:
Specific to this task: proficient
- Page 225 and 226:
Suggested Assessment: Time and qua
- Page 227 and 228:
Plans and conducts work with minima
- Page 229 and 230:
3 4 Rock Breaker Possibly muncher,
- Page 231 and 232:
LINE K: OPERATE GRADER Competency:
- Page 233 and 234:
LINE K: OPERATE GRADER Competency:
- Page 235 and 236:
LINE K: OPERATE GRADER Competency:
- Page 237 and 238:
LINE K: OPERATE GRADER Competency:
- Page 239 and 240:
Suggested Assessment: Successfully
- Page 241 and 242:
4 Describe and apply wheel lean con
- Page 243 and 244:
LINE K: OPERATE GRADER Competency:
- Page 245 and 246:
LINE K: OPERATE GRADER Competency:
- Page 247 and 248:
Achievement Criteria: General: Vis
- Page 249 and 250:
establish desired road profile - so
- Page 251 and 252:
Time and quantity as instructor dee
- Page 253 and 254:
Achievement Criteria: General: Vis
- Page 255 and 256:
ackslope or onto the road. Either w
- Page 257 and 258:
Achievement Criteria: General: Vis
- Page 259 and 260:
Suggested Assessment: A proficient
- Page 261 and 262:
disadvantage (as in ruining a good
- Page 263 and 264:
Achievement Criteria: blade float
- Page 265 and 266:
LINE L: OPERATE FELLER BUNCHER Comp
- Page 267 and 268:
LINE L: OPERATE FELLER BUNCHER Comp
- Page 269 and 270:
LINE L: OPERATE FELLER BUNCHER Comp
- Page 271 and 272:
LINE L: OPERATE FELLER BUNCHER Comp
- Page 273 and 274:
Achievement Criteria: General: Stu
- Page 275 and 276:
LINE L: OPERATE FELLER BUNCHER Comp
- Page 277 and 278:
Specific to this Task: To complete
- Page 279 and 280:
LINE M: OPERATE WHEEL SKIDDER Compe
- Page 281 and 282:
LINE M: OPERATE WHEEL SKIDDER Compe
- Page 283 and 284:
LINE M: OPERATE WHEEL SKIDDER Compe
- Page 285 and 286:
LINE M: OPERATE WHEEL SKIDDER Compe
- Page 287 and 288:
LINE M: OPERATE WHEEL SKIDDER Compe
- Page 289 and 290:
LINE N: OPERATE TRACK SKIDDER Compe
- Page 291 and 292:
LINE N: OPERATE TRACK SKIDDER Compe
- Page 293 and 294:
LINE N: OPERATE TRACK SKIDDER Compe
- Page 295 and 296:
Achievement Criteria: General: Vis
- Page 297 and 298:
Achievement Criteria: General: Vis
- Page 299 and 300:
LINE N: OPERATE TRACK SKIDDER Compe
- Page 301 and 302:
LINE O: OPERATE GRAPPLE YARDER Comp
- Page 303 and 304:
LINE O: OPERATE GRAPPLE YARDER Comp
- Page 305 and 306:
LINE O: OPERATE GRAPPLE YARDER Comp
- Page 307 and 308:
Suggested Assessment: Observation
- Page 309 and 310:
LINE O: OPERATE GRAPPLE YARDER Comp
- Page 311 and 312:
LINE P: OPERATE DANGLE HEAD PROCESS
- Page 313 and 314:
Suggested Assessment: An exercise
- Page 315 and 316:
6 Adjust track tension as required
- Page 317 and 318:
LINE P: OPERATE DANGLE HEAD PROCESS
- Page 319 and 320:
LINE P: OPERATE DANGLE HEAD PROCESS
- Page 321 and 322:
Demonstrate proper positioning to l
- Page 323 and 324:
LINE Q: OPERATE LOG LOADER Competen
- Page 325 and 326:
LINE Q: OPERATE LOG LOADER Competen
- Page 327 and 328:
LINE Q: OPERATE LOG LOADER Competen
- Page 329 and 330:
Specific to this task: To complete
- Page 331 and 332:
LINE Q: OPERATE LOG LOADER Competen
- Page 333 and 334:
LINE Q: OPERATE LOG LOADER Competen
- Page 335 and 336:
SECTION 3 TRAINING PROVIDER STANDAR
- Page 337 and 338:
4 - Apply Operating Fundamentals Tr
- Page 339 and 340:
Dumpy level (builders level, ‘tra
- Page 341 and 342:
Cat Operator e-Learning CDs Cat e-L
- Page 343 and 344:
Abbreviations: BM or B/M: bench ma
- Page 345 and 346:
Term daylighting density embankment
- Page 347:
Term Definition ownership, or appro