Following <strong>the</strong> <strong>Limes</strong> Conference arranged by Hungary in 2003, <strong>the</strong> Town<br />

Municipality of Paks could start <strong>the</strong> long-proposed reconstruction project, which was<br />

financed from its own budget and external funds.<br />

In 2001-2002 preparatory actions have been introduced <strong>for</strong> <strong>the</strong> reconstruction of<br />

historical heritage:<br />

- The Town Municipality of Paks voted 5 MFt <strong>for</strong> <strong>the</strong> reconstruction of <strong>the</strong> military<br />

<strong>for</strong>t during its meeting in November 2001.<br />

- The Town Municipality of Paks submitted a tender <strong>for</strong> <strong>the</strong> reconstruction of<br />

Lussonium to <strong>the</strong> Heritage Protection Department of <strong>the</strong> Ministry of National<br />

Heritage. Following a successful tender application, <strong>the</strong> available budget <strong>for</strong> <strong>the</strong><br />

reconstructions increased by 5 MFt.<br />

- The Ybl-prize winner architect, Ágnes H. Vladár, was assigned by <strong>the</strong> Town<br />

Municipality of Paks to complete <strong>the</strong> building plans, while Károly Őrsi designed<br />

<strong>the</strong> horticultural plans. 6<br />

- The territories, which had multiple owners, were purchased by <strong>the</strong> Town<br />

Municipality and <strong>the</strong> lot numbers were unified. 7<br />

Reconstruction works of <strong>the</strong> Roman <strong>for</strong>t started with <strong>the</strong> landscaping of <strong>the</strong> site in<br />

early spring 2003. The clearing of <strong>the</strong> thick vegetation took several weeks. The<br />

uncovering of <strong>the</strong> previously excavated <strong>for</strong>t and its buildings was completed with<br />

manual and automatic work<strong>for</strong>ce. The filling of <strong>the</strong> loess fall at <strong>the</strong> western and<br />

nor<strong>the</strong>rn side of <strong>the</strong> loess wall was completed as well.<br />

As a result, a section of <strong>the</strong> sou<strong>the</strong>rn wall, <strong>the</strong> two gate-towers, several rooms of a<br />

military building and <strong>the</strong> 5th century tower were partially reconstructed. 8 A ballastroad<br />

was also built across <strong>the</strong> plateau and a new landscaping action was started on <strong>the</strong><br />

basis of <strong>the</strong> horticultural plans made by Károly Őrsi.<br />

6 H. Vladár Ágnes: Paks-Dunakömlőd Lussonium római erőd állagmegóvási-műemlékhelyreállítási munkái. Bp.<br />

2002; Őrsi Károly: Paks-Dunakömlőd Lussonium római erőd kertépítészeti tervei. Bp. 2002.<br />

7 The new topographical number since 2002 is 01044/1.<br />

8 The planned reconstruction works of <strong>the</strong> existing walls at <strong>the</strong> military camp were conducted by stone<br />

sculptor-restorer György Asztalos and <strong>the</strong> Renome-R LP.