- Page 4 and 5: 5.3 Analysis of economic benefits .
- Page 6 and 7: Events from left to right: Project
- Page 8 and 9: excavations were regularly supporte
- Page 10 and 11: Another map shows a double trench a
- Page 12 and 13: Archaeological excavation at Lusson
- Page 14 and 15: The fort was demolish at the end of
- Page 16 and 17: The thoughts and ideas of the archa
- Page 18 and 19: Following the Limes Conference arra
- Page 20 and 21: Reconstructions during 2003
- Page 22 and 23: Opening ceremony of the ruin garden
- Page 24 and 25: - Setting up outdoor furniture at t
- Page 26 and 27: Reconstruction of the northern gate
- Page 28 and 29: The walls and gate-towers surroundi
- Page 30 and 31: In 2011 the municipality initiated
- Page 32 and 33: An agreement has been concluded on
- Page 34 and 35: Ground layers at Unit No. 6., Excav
- Page 36 and 37: The unrestored and restored statue
- Page 38 and 39: In addition, two square-shaped furn
- Page 40 and 41: iron- and 10 glass-made) along with
- Page 42 and 43: only be determined with further exc
- Page 44 and 45: Locations of 2009-2011 excavations
- Page 46 and 47: The front cover of the feasibility
- Page 48 and 49: Participants of the information day
- Page 50 and 51: Plans on the presentation of the fo
- Page 52 and 53:
The ground plan of the reception bu
- Page 54 and 55:
Exhibited roll-ups at the conferenc
- Page 56 and 57:
The invitation card of the internat
- Page 58 and 59:
3.10 The promotion of achieved goal
- Page 60 and 61:
At the Roman ruin garden, which was
- Page 62 and 63:
A reconstruction of the Emperor-sta
- Page 64 and 65:
Handicraft activities and pottery d
- Page 66 and 67:
3.15 Evaluation of executed reconst
- Page 68 and 69:
4. Operation plan 4.1 Management re
- Page 70 and 71:
Lussonium = Paks, Dunakömlőd. The
- Page 72 and 73:
• After the completion of the rec
- Page 74 and 75:
(June-August). These events would f
- Page 76 and 77:
Based on the previously stated fact
- Page 78 and 79:
Heating costs: (based on the price
- Page 80 and 81:
Income from operating activities 1.
- Page 82 and 83:
financial cash-flow According to th
- Page 84 and 85:
Impact factors FNPV FRR Investment
- Page 86 and 87:
probability of their occurrence and
- Page 88 and 89:
6. Summary I. Lussonium before the
- Page 90 and 91:
Therefore, the Town Municipality of
- Page 92 and 93:
assistance in solving technical pro
- Page 94 and 95:
Promotion: Posters, leporellos, pos
- Page 96 and 97:
- conditions of stay (rest room, co
- Page 98 and 99:
guarantees 5% self-financing. Since
- Page 100 and 101:
3. Residual value 4. Total financia
- Page 102 and 103:
flow of expenses 1+2+3+4 +5 7. Fina
- Page 104 and 105:
The opportunity to provide informat
- Page 106 and 107:
temporary exhibitions and presentat