Consolidated Financial Statements of the Stadtwerke Leipzig Group ...

Consolidated Financial Statements of the Stadtwerke Leipzig Group ...

Consolidated Financial Statements of the Stadtwerke Leipzig Group ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Electronic verification <strong>of</strong> hazardous waste<br />

disposal: By law, <strong>Stadtwerke</strong> <strong>Leipzig</strong> GmbH<br />

must introduce an electronic system to verify<br />

<strong>the</strong> disposal <strong>of</strong> hazardous waste by 31 March<br />

2010. All <strong>the</strong> necessary preparations for a timely<br />

introduction were made in 2009 as part <strong>of</strong> an<br />

extensive project. Defined IT interfaces will<br />

ensure <strong>the</strong> electronic exchange <strong>of</strong> data between<br />

waste producers, transport companies and waste<br />

disposers called for by <strong>the</strong> authorities.<br />

No contaminated sites needed remediation<br />

in 2009: <strong>Stadtwerke</strong> <strong>Leipzig</strong> GmbH owns land<br />

on which <strong>the</strong> soil or groundwater could be<br />

polluted as a result <strong>of</strong> previous industrial use.<br />

Possible contamination is investigated under<br />

<strong>the</strong> “notice <strong>of</strong> exemption from responsibility for<br />

<strong>the</strong> remediation <strong>of</strong> contaminated sites” in close<br />

coordination with <strong>the</strong> authorities. In 2009, <strong>the</strong><br />

groundwater was monitored at two sites (Arno-<br />

Nitzsche-Strasse 35 and Eutritzscher Strasse<br />

14b), and initial investigations were made at <strong>the</strong><br />

former Mitte and Lindenau heating stations and<br />

<strong>the</strong> Lausen transformer substation. The investigations<br />

showed that <strong>the</strong>re was no short-term<br />

need for remediation measures on this land in<br />

2009. However, <strong>Stadtwerke</strong> <strong>Leipzig</strong> GmbH has<br />

made provisions to cover any future remediation<br />

<strong>of</strong> contaminated sites.<br />

1.8 Changes in <strong>the</strong> holdings portfolio<br />

In <strong>the</strong> course <strong>of</strong> <strong>the</strong> restructuring <strong>of</strong> <strong>the</strong> holdings<br />

portfolio, SWL Anlagenvermögensverwaltungs<br />

GmbH, <strong>Leipzig</strong> (AVV), and SWL Kapitalvermögensverwaltungs<br />

GmbH, <strong>Leipzig</strong> (KVV),<br />

were merged with <strong>Stadtwerke</strong> <strong>Leipzig</strong> GmbH<br />

with effect from 1 January 2009. Fur<strong>the</strong>rmore,<br />

<strong>Stadtwerke</strong> <strong>Leipzig</strong> GmbH increased its holding<br />

in Heizkraftwerk Eutritzscher Strasse GmbH &<br />

Co. KG, <strong>Leipzig</strong> from 0.05% to 25.16%.<br />

2 Income situation, financial position,<br />

net worth position<br />

2.1 Income situation<br />

Sales development in <strong>the</strong> Trading segment:<br />

In Energy Marketing <strong>the</strong> development <strong>of</strong> sales<br />

in terms <strong>of</strong> <strong>the</strong> amount <strong>of</strong> electricity sold fell by<br />

3.6% from 1,915 GWh in 2008 to 1,847 GWh in<br />

2009. During <strong>the</strong> same period, natural gas sales<br />

were down 7.4% from 1,578 GWh in 2008 to<br />

1,461 GWh in 2009. These figures largely reflected<br />

<strong>the</strong> cyclical fall in demand and <strong>the</strong> intense<br />

competition. In <strong>the</strong> heating market, sales volumes<br />

for district heating increased, mainly due<br />

to <strong>the</strong> cooler wea<strong>the</strong>r. Sales <strong>of</strong> district heating<br />

rose by 4.1% from 1,284 GWh to 1,332 GWh.<br />

Sales in Wholesale Energy Trading increased in<br />

line with <strong>the</strong> trading market: electricity trading<br />

from 33,462 GWh to 35,082 GWh, gas trading<br />

from 6,421 GWh to 7,504 GWh.<br />

12 | Annual <strong>Financial</strong> <strong>Statements</strong> <strong>of</strong> <strong>Stadtwerke</strong> <strong>Leipzig</strong> GmbH