10.07.2015 Views

Site Survey Form Generic Format - Coastal Environmental Systems

Site Survey Form Generic Format - Coastal Environmental Systems

Site Survey Form Generic Format - Coastal Environmental Systems

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

SITE SURVEY REPORT – location name7. OID (WEATHER OFFICE) REQUIREMENTSSee Weather Office Workstation Layout, following, for siting of Workstationand required power and comm connections.PowerRequirement Existing Action By<strong>Site</strong>120 VAC 20 Amp Quadplex outlet NoneInstall atwithin 6 ft of Workstationlocation shownAction ByContractorComm -ethernetCAT 5 cable, terminated in CAT 5LAN jack within 6 ft of Workstation,connected to DPU punchdownblock. Cable run length not toexceed 40 feet.NoneProvide andinstall cable,using existingcable tray inceiling.SpaceEnd-to-endtestingTo accommodate 4” x 10” CPU,standard keyboard, mouse, 15”monitorEnd-to-end testing of allcommunication lines.NoneClear area ofObserver’sdeskPerformDecibel Loss orResistanceTestsNote incomplete items in Section 12, Outstanding Items<strong>Site</strong> <strong>Survey</strong> <strong>Form</strong> <strong>Generic</strong> <strong>Form</strong>at 6-25-13.docPage 10© 2013 <strong>Coastal</strong> <strong>Environmental</strong> <strong>Systems</strong>, Inc.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!