10.07.2015 Views

Site Survey Form Generic Format - Coastal Environmental Systems

Site Survey Form Generic Format - Coastal Environmental Systems

Site Survey Form Generic Format - Coastal Environmental Systems

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

SITE SURVEY REPORT – location name8. WORKSTATION (MAINTENANCE OFFICE) REQUIREMENTSSee MAINTENANCE Office Workstation Layout, following, for siting ofWorkstation and required power and comm connections.PowerRequirement Existing Action By<strong>Site</strong>120 VAC 20 Amp Quadplex outlet NoneInstall atwithin 6 ft of Workstationlocation shownAction By<strong>Coastal</strong>Comm – copper 2 unconditioned 24AWG or largertwisted copper pairs, terminated inRJ-45 wall jack within 6 ft ofWorkstation, connected to DPUpunchdown blockComm – fiber 2 strands of fiber optic cable,terminated in ST wall jack within 6 ftof Workstation, connected to DPUpunchdown blockComm – ethernet CAT 5 cable, terminated in CAT 5LAN jack within 6 ft of Workstation,connected to DPU punch downblock. Cable run length not toexceed 40 feet.SpaceTo accommodate 4” x 10” CPU,standard keyboard, mouse, 15”End-to-endtestingmonitorEnd-to-end testing of allcommunication lines.NoneNoneNoneInstall atlocation shownInstall atlocation shownMove existingdesk againstwallPerformDecibel Loss orResistanceTestsProvide andinstall cable(Eliminate lines showing unused communications types. Note incomplete items in Section 12,Outstanding Items)<strong>Site</strong> <strong>Survey</strong> <strong>Form</strong> <strong>Generic</strong> <strong>Form</strong>at 6-25-13.docPage 12© 2013 <strong>Coastal</strong> <strong>Environmental</strong> <strong>Systems</strong>, Inc.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!