Site Survey Form Generic Format - Coastal Environmental Systems
Site Survey Form Generic Format - Coastal Environmental Systems
Site Survey Form Generic Format - Coastal Environmental Systems
- No tags were found...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
SITE SURVEY REPORT – location nameooo•The installation of EMT conduit, flex conduit, raceways and the penetration of walls,equipment, floors, etc. for the purpose of routing cables is infrastructure work to beperformed by the Airfield.For safety reasons (due to the high voltages present in the vault) <strong>Coastal</strong> will require theBase lighting vault personnel to verify circuits to be monitored so that <strong>Coastal</strong> will not bedisturbing any existing high voltage connections or cables. <strong>Coastal</strong> will need assistance withenclosing high-voltage cable with current sensor clamp and in securing the current sensorclamp.Base lighting vault personnel will need to safety tag out and lock out CCRs<strong>Site</strong> <strong>Survey</strong> <strong>Form</strong> <strong>Generic</strong> <strong>Form</strong>at 6-25-13.docPage 15© 2013 <strong>Coastal</strong> <strong>Environmental</strong> <strong>Systems</strong>, Inc.