10.07.2015 Views

Site Survey Form Generic Format - Coastal Environmental Systems

Site Survey Form Generic Format - Coastal Environmental Systems

Site Survey Form Generic Format - Coastal Environmental Systems

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

SITE SURVEY REPORT – location name6. DPU (SERVER) REQUIREMENTSSee DPU Layout, following, for siting of DPU, printer, and required power andcomm connections.Power – DPUPower – PrinterPrinterLocationComm punchdownInterfacepunch-downDial-in VoiceCircuitGroundDPU ClearanceMaint. TerminalNTFS LocationLAN LocationRequirement Existing Action By<strong>Site</strong>Dedicated 120 VAC 20 Amp duplexoutlet with ground within 6 ft of DPUlocationDedicated 120 VAC 20 Amp duplexoutlet with ground within 6 ft ofPrinter locationWithin 6 ft cable run of DPUWithin 6 ft of DPUSpace for 4” x 12” <strong>Coastal</strong>-providedinterface punch-down. Location tobe within 6 ft of comm punch-down1 unconditioned 24 AWG or largertwisted copper pair per dedicatedtelephone number from DCO tocomm punch-downCentral facility termination pointwithin 6 ft of DPU36-inch clearance of front, rear, andat least one side for 22”x38”x48”high DPU. Allow for door swing of22”Within 6 ft cable run of DPUWithin 45 ft cable run of DPUWithin 20 ft cable run of DPUAction By<strong>Coastal</strong>End-to-end End-to-end testing of alltestingcommunication lines.Note incomplete items in Section 12, Outstanding Items<strong>Site</strong> <strong>Survey</strong> <strong>Form</strong> <strong>Generic</strong> <strong>Form</strong>at 6-25-13.docPage 8© 2013 <strong>Coastal</strong> <strong>Environmental</strong> <strong>Systems</strong>, Inc.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!