10.07.2015 Views

Electrical Plan Review Submittal Guide / Checklist - City of Bellevue

Electrical Plan Review Submittal Guide / Checklist - City of Bellevue

Electrical Plan Review Submittal Guide / Checklist - City of Bellevue

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Smokepro<strong>of</strong> enclosures and elevator shaftpressurization60 secondsfor ventilation 4 hours403.11 Highrises909 and909.20.6.2Any shaft exhaust fans required to runcontinuously in lieu <strong>of</strong> dampersElevator car operation in high-rise andunderground buildings (including controlsystem, motor controller, operationcontrol, signal equipment, machine roomcooling/heating, etc.)Elevator car lighting and communicationsin high-rise and underground buildingsLights, heating, and cooling for buildingfire command center and mechanicalequipment rooms serving the firecommand center60 seconds 4 hours 71660 seconds 4 hours 300310 seconds 4 hours 300360 seconds 24 hours604.2.15 Highrises604.2.16Undergroundbuildings604.2.15 Highrises604.2.16Undergroundbuildings604.2.19 Elevators604.2.15 HighrisesPower (other than lights, heating andcooling) for building fire command center60 seconds 4hoursMechanical and electrical systemsrequired by IFC 27 (hazardous materialsincluding UPS rooms)60 seconds 4 hours Article 27Legally Required Standby 1Pressurization equipment for low-risebuildingsExhaust fans for any loading dock locatedinterior to a building60 seconds 4 hours60 seconds 4 hours909909.20Operation <strong>of</strong> elevators used as accessiblemeans <strong>of</strong> egress in low-rise buildings(including car lighting, communications,60 seconds 4 hourscontrol system, motor controller, operation1007.4 and .53003604.2.19 Elevators1007.4 and .511

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!