10.07.2015 Views

Electrical Plan Review Submittal Guide / Checklist - City of Bellevue

Electrical Plan Review Submittal Guide / Checklist - City of Bellevue

Electrical Plan Review Submittal Guide / Checklist - City of Bellevue

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

control, signal equipment, machine roomcooling/heating, etc.)Fire pumps in low-rise buildings 10 seconds 8 hours913.2 and NFPA20Transformer vault ventilation equipment 60 seconds 4 hoursHeat tape for sprinkler lines and heating insprinkler riser roomsFuel pump system for any legally-requiredsystem60 seconds 24 hours60 seconds 4 hoursSewage disposal pumps 60 seconds 4 hoursTABLE 403(1) FOOTNOTES:1. The fuel pump and associated systems for the emergency or legally required generator shall be provided with powerfrom the generator to maintain fuel supply.FormsCopies <strong>of</strong> these forms are found on the following pages:Fault Current Calculation FormSample One-Line DiagramSample Single-Phase Panel ScheduleSample 3-Phase Panel ScheduleGenerator Calculation FormSample Fault Current Calculation Summary FormPhotovoltaic System One Line and Spec SheetYour submittal may use our forms, or you may create your own (as long as they are in accordance with ourrequirements), except for large projects that require more extensive fault current calculations.12

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!