10.07.2015 Views

Electrical Plan Review Submittal Guide / Checklist - City of Bellevue

Electrical Plan Review Submittal Guide / Checklist - City of Bellevue

Electrical Plan Review Submittal Guide / Checklist - City of Bellevue

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Revisions made after <strong>Plan</strong>s approval____ Provide revision symbols (clouds or other effective means) around changes with something to indicatethe date it was changed. These need to stay on the plans throughout the project.____ Provide descriptions <strong>of</strong> specific changes that are proposed in the revised areasEmergency and Legally Required Systems Equipment(what type equipment needs to be on which system)TABLE 403(1)STANDBY (LEGALLY REQUIRED) AND EMERGENCY POWERType <strong>of</strong> EquipmentMaximumTime toEnergizeLoadsMinimum RunTime (Duration)IBC SectionIFC or NFPASectionEmergency Power Systems 1604.2.15 HighrisesExit signs10 seconds2 hours forgenerator power;1011.5.3or 90 minutes forbattery backup604.2.16Undergroundbuildings1011.5.32403.12.6.1Temporary tents,canopies,membranestructures1006.3Exit illumination 10 seconds 8 hours 1006.3604.2.15 Highrises604.2.16Underground9

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!