Electrical Plan Review Submittal Guide / Checklist - City of Bellevue
Electrical Plan Review Submittal Guide / Checklist - City of Bellevue
Electrical Plan Review Submittal Guide / Checklist - City of Bellevue
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Utility XFRM Voltage AIC (Start) Date Project Title: <strong>City</strong> <strong>of</strong> <strong>Bellevue</strong> Permit Number: PageConductor Conductor Conductor Description: Raceway: AIC AIC AIC CheckedFrom To Size Type (CU/AL) Length/Ft. Imp./1K Ft. Qty./Ph. Metal/PVC Start End Equip/Brkr** The AIC rating <strong>of</strong> the equipment is the lowest value between the breaker and equipmentPlease confirm that the AIC values are shown on the one line/riser diagram20