10.07.2015 Views

Bid Document for Hawkers Rehab Centre in Digha.pdf - Integrated ...

Bid Document for Hawkers Rehab Centre in Digha.pdf - Integrated ...

Bid Document for Hawkers Rehab Centre in Digha.pdf - Integrated ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

** immediately preced<strong>in</strong>g the f<strong>in</strong>ancial year <strong>in</strong> which bids are received.β Attach certificate from CharteredAccountant.1.4 In<strong>for</strong>mation on <strong>Bid</strong> Capacity (works <strong>for</strong> which bids have been submitted and works which are yet to becompleted) as on the date of this bid.(A)Exist<strong>in</strong>g commitments and on-go<strong>in</strong>g works:____________________________________________________________________________________________Description Place Contract No. Name Value of Stipulated Value of works* Anticipatedof & & Date and Contract period of rema<strong>in</strong><strong>in</strong>g to be date ofWork State Address (Rs. million) completion completed completionof Employer(Rs. million)(1) (2) (3) (4) (5) (6) (7) (8)______________________________________________________________________________________________________________________________________________________________________________________(B) Works <strong>for</strong> which bids already submitted:____________________________________________________________________________________________Description Place Name and Estimated Stipulated Date when Remarksof & Address of value of works period of decision is if anyWork State Employer (Rs. million) completion expected(1) (2) (3) (4) (5) (6) (7)* Attach certificate(s) from the Eng<strong>in</strong>eer(s)-<strong>in</strong>-Charge.1.5 The follow<strong>in</strong>g items of Contractor's Equipment are essential <strong>for</strong> carry<strong>in</strong>g out the Works. The <strong>Bid</strong>der should listall the <strong>in</strong><strong>for</strong>mation requested below. Refer also to Sub Clause 4.3 (d) of the Instructions to <strong>Bid</strong>ders._______________________________________________________________________________________Item of Requirement Availability proposals Remarksequipment No. Capacity Owned/leased/ Nos/ Age/ (From whom to beto be procured capacity condition purchased)_______________________________________________________________________________________Concrete Mixture * * * * * * *Excavator * * * * * * *Needle vibrator and plate vibratorTruck/Tipper5 H.P water pump_______________________________________________________________________________________25

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!