- Page 2 and 3: INVITATION FOR BID(IFB)2
- Page 6: Section 1: Instructions to BiddersT
- Page 9 and 10: (d)(e)The contractor or his identif
- Page 11 and 12: B. Bidding Documents8. Content of B
- Page 13 and 14: 15.2 In exceptional circumstances,
- Page 15 and 16: 20.2 The Employer may extend the de
- Page 17 and 18: 29.1 The Employer will evaluate and
- Page 19 and 20: 37.1 It is the Bank’s policy to r
- Page 21 and 22: SECTION 2:FORMS OF BID, QUALIFICATI
- Page 23 and 24: We hereby confirm that this Bid com
- Page 25 and 26: ** immediately preceding the financ
- Page 27 and 28: 1.12 Statement of compliance under
- Page 29 and 30: Letter of Acceptance(letterhead pap
- Page 31 and 32: Issue of Notice to proceed with the
- Page 33 and 34: In witness whereof the parties ther
- Page 35 and 36: Conditions of ContractTable of Cont
- Page 37 and 38: The Intended Completion Date is the
- Page 39 and 40: 10. Employer’s and Contractor's R
- Page 41 and 42: 24. DisputesThe Contractor’s atte
- Page 43 and 44: 34.1 If the Engineer-in-charge r in
- Page 45 and 46: 44. Compensation Events44.1 The fol
- Page 47 and 48: 51.1 The Employer shall make advanc
- Page 49 and 50: 60. Payment upon Termination60.1 If
- Page 51 and 52: F. Special Conditions of Contract1.
- Page 53 and 54: measures, such as Canteens, First-A
- Page 55 and 56:
discharge of any sewage or trade ef
- Page 57 and 58:
S.No.ActivityMeasures to be Impleme
- Page 59 and 60:
SECTION 4: CONTRACT DATA59
- Page 61 and 62:
___________________________________
- Page 63 and 64:
Nature of Advance Amount (Rs.) Cond
- Page 65 and 66:
SECTION 5: SPECIFICATIONS65
- Page 67 and 68:
The contractor shall take adequate
- Page 69 and 70:
40 IS-814: 1991 Electrodes for manu
- Page 71 and 72:
123 IS-1868: 1983 Code of practice
- Page 73 and 74:
specification. The damp proof cours
- Page 75 and 76:
The water cement ratio is to be det
- Page 77 and 78:
9.1 Frequency of sampling:9.1.1 Sam
- Page 79 and 80:
to maintain thinner plaster layer.
- Page 81 and 82:
materials. Filling with sand should
- Page 83 and 84:
7.5 R.C.C. NP3 pipe:All R.C.C. NP3
- Page 87 and 88:
At points where the contour of the
- Page 89:
Jointing of D.I. specials with the
- Page 93 and 94:
SECTION 7: BILL OF QUANTITIES93
- Page 95 and 96:
Chlorophyrofos emulsifiable concent
- Page 97 and 98:
contact surface of the frame exclud
- Page 99 and 100:
thick sand & cement plaster (1:4) a
- Page 101:
) 20 mm dia medium duty Mtrs 40c) 2
- Page 105 and 106:
necessary fittings and jointing mat
- Page 107 and 108:
RATESL.NO.DESCRIPTION UNIT IN FIGUR
- Page 109 and 110:
position and binding with 16 gauge
- Page 111 and 112:
222324F25262728293031Anodised alumi
- Page 113 and 114:
Supplying & Fixing sheet metal insp
- Page 115 and 116:
23 Schedule of rates for installati
- Page 117 and 118:
mm. including watering and ramming
- Page 119 and 120:
(1:4) cement plaster to inside wall
- Page 121 and 122:
Supplying and testing of following
- Page 123 and 124:
mm including watering and ramming e
- Page 125 and 126:
12 125 mm thick brick work with 1st
- Page 127 and 128:
2425G262728Anodised aluminium tower
- Page 129 and 130:
89Supplying , fitting & fixing 25mm
- Page 131 and 132:
252627E28fixing in position and pai
- Page 133 and 134:
On Board Point 568Fixing only fan r
- Page 135 and 136:
end of 7/10 SWG GI (Hot Dip) strand
- Page 137 and 138:
4142with all necessary accessories
- Page 139 and 140:
d) Above 1st Roof Sqm 249.5310Reinf
- Page 141 and 142:
232425G262728arrangement both insid
- Page 143 and 144:
dia. approved quality PVC waste pip
- Page 145 and 146:
75 mm dia each 5.00v) Door Bend (T.
- Page 147 and 148:
) Average run 8 mtr Point 60Distn.
- Page 149 and 150:
equipments with bolts, nuts, washer
- Page 151 and 152:
500W with 300W Halgen )39 Supply of
- Page 153 and 154:
filling the space between the brick
- Page 155 and 156:
18Supply and installation of local
- Page 157 and 158:
slope and jointing with stiff mixtu
- Page 159 and 160:
23456(Trench shall be kept dry by d
- Page 161 and 162:
5.1 For 2 coreupto 4 sqmm Each 4.00
- Page 163 and 164:
34H123if needed (the good earth sha
- Page 165 and 166:
245Depth of foundation upto 1500mmE
- Page 167 and 168:
direction of the Engineer In Charge
- Page 169 and 170:
clearance of 6 mm from wall includi
- Page 171 and 172:
Eucalyptus / Jhou bulla pilling shu
- Page 173 and 174:
polymerised adhesive (6mm thick lay
- Page 175 and 176:
32333435H36coatsSolvent based inter
- Page 177 and 178:
a) 300 mm long Each 5b) 450 mm long
- Page 179 and 180:
2930E31(A) Above ground(i) 75 mm di
- Page 181 and 182:
a)Laying of one no. cable upto 35 s
- Page 183 and 184:
28Supplying & Fixing bulkhead light
- Page 185 and 186:
c) 1st Floor Cum 3.14d) 2nd Floor C
- Page 187 and 188:
181920finish anodised (15 - 18 micr
- Page 189 and 190:
cutting pipes, making threads, fitt
- Page 191 and 192:
35.56 cm with locking arrangement,
- Page 193 and 194:
SL.IN WORDDESCRIPTION UNIT IN FIGUR
- Page 195 and 196:
D LANDSCAPING AND PATHWAYS1Earth wo
- Page 197 and 198:
all respect with all costs of labou
- Page 199 and 200:
15 Supplying and fixing single pole
- Page 201 and 202:
5678I123pipes with minimum thicknes
- Page 203 and 204:
cement with Super plasticiser per c
- Page 205 and 206:
242526quality including smoothening
- Page 207 and 208:
CP Pillar cock - 15 mm.13Supplying,
- Page 209 and 210:
27work, if necessary, but including
- Page 211 and 212:
Schedule of Quantities for Electric
- Page 213 and 214:
213
- Page 215 and 216:
ANEXURE-DSECTION 8: FORMS OF SECURI
- Page 217 and 218:
Annex ABID SECURITY (BANK GUARANTEE
- Page 219 and 220:
PERFORMANCE BANK GUARANTEE (for unb
- Page 221:
221